BA-26-023-GK Project reserve water Gjøvik-Biri ENT1B Raw water pump station (V2).
Original notice title
Norway – Pipeline, piping, pipes, casing, tubing and related items – BA-26-023-GK Project reserve water Gjøvik-Biri ENT1B Raw water pump station (V2).
Opportunity Score
Why this score?
Opportunity
60 / 100
Complexity
70 / 100
Risk factors
Award criteria in structured data are incomplete; actual weightings (price 55%, climate/environment 30%, implementation...
No procurement documents provided for analysis; tender may contain critical requirements not captured in notice.
No procurement documents available
Deep Portfolio Analysis
Uses:
- Description
- Industries & Services
- Capabilities
- Market & Experience
- Certifications
Tender facts
- Contracting authority
- Gjøvik Kommune
- Country
- Norway
- CPV
- 44160000 - Pipeline, piping, pipes, casing, tubing and related items +8 more
- Deadline
- Aug 21, 2026
- Estimated value
- NOK 95M (approx. EUR 8.5M)
Overview
Moderate opportunityKey Facts
- NOK 95M estimated value
- Supplies contract
- 1 lot
- Duration 46 MONTH
- Construction of a raw water pump station
- Execution of pipelines from ENT2 to ENT3 (land pipeline contract)
Show full summary
This tender concerns the construction of a raw water pump station and associated pipelines as part of a backup water supply system for Gjøvik and Biri municipalities in Norway. The project is a negotiated procedure with call for competition, with a single lot covering the pump station and pipeline work. The estimated value is 95,000,000 NOK (not specified if excluding VAT). The deadline for submission is 2026-08-21T11:00:00Z. The tender notice is incomplete in structured data regarding award criteria and selection criteria, but additional details are found in the XML notice.
Risks
Award criteria in structured data are incomplete; actual weightings (price 55%, climate/environment 30%, implementation...
No procurement documents provided for analysis; tender may contain critical requirements not captured in notice.
No procurement documents available
Analysis may be incomplete
Only part of the procurement documentation was analyzed. Additional eligibility requirements, certificates, or submission documents may exist in the remaining tender documentation.
Key Requirements
Technical
- Contract duration: 46 months
- EU-funded project
Administrative
- Tender must be submitted electronically via Artifik platform
Requirements may be incomplete.
Award Criteria
Lot 1
Buyer
Name
Location
Gjøvik, NOR
Website
Buyer profile
Identifier
940155223
Activity
General public services
Lots (1)
LOT-0001
BA-26-023-GK Project reserve water Gjøvik-Biri ENT1B Raw water pump station (V2).
Establishment of a raw water pump station and execution of pipelines from ENT2 up to the land pipeline contract (ENT3), as part of Stage 2 of the backup water system. Scope includes waterproof concrete constructions, deep sheet pitting, pressurised stainless steel pipes, pump installation, and steel pipes.
EUR 8.5M
Estimated value
Location
Duration
Category
Award Criteria
Deadline
Award details
Price
Additional CPV codes
Value note
Show original TED data
Original TED description
Gjøvik municipality is responsible for ensuring a safe and stable delivery of drinking water to the inhabitants of the municipality. In order to strengthen security of supply, it has been decided to establish a full-fledged back-up water system that can supply both Biri and Gjøvik. Stage 1 of the project included the establishment of an submarine pipeline from Gjøvik to Redalen, the construction of a pressure increase station, as well as establishing a connection point for continuing the pipeline towards Biri. The sea pipeline was lowered in Mjøsa in autumn 2020, and after completion of the pump station the facility was put into operation in 2021. In stage 2 the pipeline shall be continued from Redalen to Biri, where both a raw water pump station and a new water treatment plant shall be established. In this contract, the establishment of a raw water pump station with the execution of pipelines from ENT2 up until the land pipeline contract ("ENT3") shall be executed.
Procurement Details
- Publication date
- 09 Jul 2026
- Languages
- English, Norwegian
Reference metadata
- Legal basis
- 32014L0025
Reference IDs
- Tender ID
- 476816-2026
Documents (1)
Similar tenders
France – Structures construction work – PHASE CANDIDATURE - Rénovation du site des réservoirs de Montfermeil et création d'une station de chloration
Ireland – Steel – Dynamic Purchasing System (DPS) for Course Consumables for use in Donegal Education and Training Board Training Centres and Schools
Germany – Construction work for water and sewage pipelines – Leitungsbau im Spülbohrverfahren
Denmark – Construction work – Kvalifikationsordning vedrørende hovedentrepriser for etablering og udvidelse af gasanlæg
Sweden – Heating, ventilation and air-conditioning installation work – DIS - Undercentraler och värmepumpsanläggningar
Ireland – Works for complete or part construction and civil engineering work – 23/040 - A Qualification System for the Provision of General Building and Civil Engineering Maintenance and Repair Works to Uisce Éireann
Opportunity Score
Why this score?
Opportunity
60 / 100
Complexity
70 / 100
Risk factors
Award criteria in structured data are incomplete; actual weightings (price 55%, climate/environment 30%, implementation...
No procurement documents provided for analysis; tender may contain critical requirements not captured in notice.