Tenderwize
Back to tender search

Expansion of photovoltaic farm with accompanying infrastructure in Lewin Kłodzki – Stage II

Gmina Lewin Kłodzki·Lewin Kłodzki, Poland·Expired · Jul 20, 2026·Open·Supplies
Original notice title

Poland – Solar photovoltaic modules – „Rozbudowa farmy fotowoltaicznej wraz z infrastrukturą towarzyszącą na terenie gminy Lewin Kłodzki – ETAP II”

50/100

Opportunity Score

Needs reviewMedium complexity
SuppliesExpired
Why this score?

Opportunity

50 / 100

Complexity

65 / 100

Risk factors

Extremely tight deadline of 12 days for a technical project requiring detailed preparation, site assessment, and docume...

No estimated value or budget disclosed; bidders cannot assess financial feasibility or allocate resources.

Deep Portfolio Analysis

Deep Company Fit Analysis

Uses:

  • Description
  • Industries & Services
  • Capabilities
  • Market & Experience
  • Certifications

Overview

Moderate opportunity

Key Facts

  • Supplies contract
  • 1 lot
  • Duration 4 MONTH
  • Supply, installation, and commissioning of a 659.88 kWp solar photovoltaic installation.
  • Connection to existing 20/0.4 kV transformer station and telemechanics system.
Show full summary

This tender (Stage II) involves the expansion of a photovoltaic farm in Lewin Kłodzki, Poland, including supply, installation, and commissioning of a 659.88 kWp solar PV system, connection to an existing 20/0.4 kV transformer station, and telemechanics integration. The contract is a single lot, open procedure, with a 4-month duration. EU funding is indicated in structured data but the XML notice states 'no-eu-funds'. No estimated value is provided. The submission deadline is 2026-07-20 at 09:00 CEST (07:00 UTC). Award criteria: price (60%) and quality (40%). The tender documents are available online but were not analyzed in detail.

Risks

Extremely tight deadline of 12 days for a technical project requiring detailed preparation, site assessment, and docume...

No estimated value or budget disclosed; bidders cannot assess financial feasibility or allocate resources.

Analysis may be incomplete

Only part of the procurement documentation was analyzed. Additional eligibility requirements, certificates, or submission documents may exist in the remaining tender documentation.

Key Requirements

Technical

  • Installation of solar photovoltaic modules (CPV 09331200).
  • Electrical installation work (CPV 45310000).

Administrative

  • Compliance with technical documentation and project design (referenced in tender documents).

Award Criteria

Lot 1

Price: 60% weight60%Quality - Inverter warranty period: 15% weight15%Quality - Temperature coefficient: 10% weight10%Quality - Fire resistance class: 10% weight10%Quality - Support structure warranty: 5% weight5%

Buyer

Location

Lewin Kłodzki, POL

Identifier

8831678631

Activity

General public services

Lots (1)

LOT-0001

Expansion of photovoltaic farm with accompanying infrastructure in Lewin Kłodzki – Stage II

Supply, installation, and commissioning of a 659.88 kWp solar PV installation, connection to existing 20/0.4 kV transformer station and telemechanics system, as described in the project documentation.

SuppliesEU fundedElectronic submission

Location

PL517, Poland

Duration

4 MONTH

Category

Solar photovoltaic modules

Award Criteria

Best price-quality ratio

Deadline

Expired Jul 20, 2026

Procurement Details

Publication date
08 Jul 2026
Languages
Polish

Reference metadata

Legal basis
32014L0024

Reference IDs

Tender ID
474337-2026

Documents (1)

Similar tenders