Tenderwize
Back to tender search

H2G Hydrogen System

Hochschule Reutlingen·Reutlingen, Germany·Expired · Aug 01, 2026·Neg W Call·Supplies
Structured notice only
Original notice title

Germany – Fuel cells – H2G Wasserstoffsystem

55/100

Opportunity Score

Needs reviewHigh complexity
SuppliesExpired
Why this score?

Opportunity

55 / 100

Complexity

75 / 100

Risk factors

No estimated contract value; budget allocation unknown. May lead to resource misallocation or disqualification if bid e...

Submission deadline is only about 23 days from publication; complex technical proposals require significant preparation...

Deep Portfolio Analysis

Deep Company Fit Analysis

Uses:

  • Description
  • Industries & Services
  • Capabilities
  • Market & Experience
  • Certifications

Overview

Moderate opportunity

Key Facts

  • Supplies contract
  • 1 lot
  • Planning, construction, delivery, integration, commissioning, and acceptance of a hydrogen electrolysis and fuel cell system
  • Integration into existing energy systems at the KST site in Tübingen
Show full summary

This tender by Hochschule Reutlingen seeks a turnkey hydrogen system (electrolysis and fuel cell) for a real-world laboratory (H2-Grid project). It is a competitive negotiated procedure with a two-stage selection: shortlisting based on references (max 5 bidders), then invitation to tender. Award criteria are price (50%) and technical quality (50%) with detailed sub-criteria and minimum scores. No estimated value is provided. The procurement documents are available but were not analyzed. The tender is suitable for SMEs/startups, but the deadline is tight (approx. 23 days from publication) and the technical requirements are complex.

Risks

No estimated contract value; budget allocation unknown. May lead to resource misallocation or disqualification if bid e...

Submission deadline is only about 23 days from publication; complex technical proposals require significant preparation...

Analysis may be incomplete

Only part of the procurement documentation was analyzed. Additional eligibility requirements, certificates, or submission documents may exist in the remaining tender documentation.

Key Requirements

Technical

  • Turnkey delivery of a complete hydrogen generation and utilization system
  • System must be fully operational and accepted
  • Compliance with safety, approval, and acceptance requirements (e.g., TÜV, fire protection)

Requirements may be incomplete.

Award Criteria

Lot 1

Price score (50% weight)50%Quality composite score (50% weight) with mandatory minimum thresholds50%

Buyer

Location

Reutlingen, DEU

Identifier

0049 7121 271 7013

Activity

Education

Lots (1)

LOT-0001

H2G Hydrogen System

Planning, construction, delivery, integration, commissioning, and acceptance of a hydrogen production (electrolysis) and fuel cell system as part of a real-world laboratory at the KST site in Tübingen. The system must be fully operational and accepted by the project end (30 June 2027), with invoicing by 31 May 2027.

SuppliesEU fundedElectronic submissionSME suitable

Location

Reutlingen, Germany

Category

Fuel cells

Award Criteria

Best price-quality ratio

Deadline

Expired Aug 01, 2026

Procurement Details

Publication date
08 Jul 2026
Languages
German

Reference metadata

Legal basis
32014L0024

Reference IDs

Tender ID
473158-2026

Documents (2)

Similar tenders