Demolition and replacement of bridge Iserlohner Straße
Original notice title
Germany – Road bridge construction work – A44, Ersatzneubau BW 4412 221 Iserlohner Straße
Opportunity Score
Why this score?
Opportunity
50 / 100
Complexity
75 / 100
Risk factors
Absence of estimated value may indicate uncertainty in budget or lead to unexpectedly low/high pricing expectations.
Strict reference and turnover requirements may exclude smaller or less experienced bidders.
Submission deadline in 4 days
Deep Portfolio Analysis
Uses:
- Description
- Industries & Services
- Capabilities
- Market & Experience
- Certifications
Overview
Moderate opportunityKey Facts
- Works contract
- 1 lot
- Duration 10 MONTH
- Demolition of existing bridge structure
- Structural design and construction of new two-span bridge
Show full summary
This open tender by Die Autobahn GmbH (NL Westfalen) concerns the demolition and replacement of the Iserlohner Straße bridge (BW 4412 221) over the A44 motorway near Unna-Ost junction. The works include demolition, design, and construction of a new bridge, with a duration of 10 months. No estimated value is provided. The procedure is open, with electronic submission allowed. Tender documents are available online. Key requirements include proven experience in comparable bridge works, minimum annual turnover of €7M in bridge construction, and various technical qualifications.
Risks
Absence of estimated value may indicate uncertainty in budget or lead to unexpectedly low/high pricing expectations.
Strict reference and turnover requirements may exclude smaller or less experienced bidders.
Submission deadline in 4 days
Analysis may be incomplete
Only part of the procurement documentation was analyzed. Additional eligibility requirements, certificates, or submission documents may exist in the remaining tender documentation.
Key Requirements
Technical
- At least 3 comparable bridge references in last 5 years (two-span, total span >50m, traffic category 1, over federal highway)
- Proof of welding qualification for execution class EXC3 (if steel/composite structure)
Eligibility
- Minimum annual turnover of €7,000,000 in bridge construction
Requirements may be incomplete.
Award Criteria
Lot 1
Buyer
Location
Halle (Saale), DEU
Website
Buyer profile
Identifier
USt-ID DE329214156
Activity
General public services
Lots (1)
LOT-0000
Demolition and replacement of bridge Iserlohner Straße
Demolition of the existing overpass and construction of a new two-span bridge (spacing >50m) over BAB 44 near Unna. Works include structural planning, traffic management, and compliance with technical standards.
Location
Duration
Category
Award Criteria
Deadline
Award details
2.1 Verkehrsbeschränkte Zeit (10%), 2.2 Konzept zur Einhaltung der Bauzeit (10%), 2.3 Bautechnik (bautechnisches Konzept) (10%)
Additional CPV codes
Value note
Show original TED data
Original lot title
A44, Ersatzneubau BW 4412 221 Iserlohner Straße
Original TED description
Abbruch und Ersatzneubau des Überführungsbauwerks "Iserlohner Straße" (Bestand: 4412 835; Neu: 4412 221) über die BAB 44 nahe der Anschlusstelle Unna Ost.
Procurement Details
- Publication date
- 07 Jul 2026
- Languages
- German
Reference metadata
- Legal basis
- 32014L0024
Reference IDs
- Tender ID
- 468773-2026
Documents (2)
Similar tenders
Romania – Road construction works – Servicii de proiectare, asistență tehnica din partea proiectantului şi executie de lucrari la obiectivul de investitii: "Modernizare infrastructura de transport regional pe traseul Cataloi – Frecatei – Posta – Telita – INT. DN22 (DJ229A)”
Germany – Road construction works – Kreuzungsfreier Ausbau Frankenschnellweg, Abschnitt West: Bauleistungen, Straßen- & Ingenieurbau
Italy – Road bridge construction work – S.S. 52 “Carnica” – Lavori di ricostruzione del ponte sul Fiume Fella nei Comuni di Amaro e Venzone dal km. 0+800 circa al km. 1+190 circa.
Germany – Road construction works – Kreuzungsfreier Ausbau Frankenschnellweg, Abschnitt West: Bauleistungen, Straßen- & Ingenieurbau
France – Road bridge construction work – RN12 - Déviation d'Ernée - Construction du viaduc de l'Ernée
France – Road bridge construction work – RN4 - Mise à 2x2 voies entre Gogney et Saint-Georges - Construction des OH2-PI3, OHf et Ohh
Opportunity Score
Why this score?
Opportunity
50 / 100
Complexity
75 / 100
Risk factors
Absence of estimated value may indicate uncertainty in budget or lead to unexpectedly low/high pricing expectations.
Strict reference and turnover requirements may exclude smaller or less experienced bidders.
Submission deadline in 4 days
Deep Portfolio Analysis
Uses:
- Description
- Industries & Services
- Capabilities
- Market & Experience
- Certifications