Copenhagen - New Metroline, M5 Civil Works South.
Original notice title
Denmark – Construction work – Copenhagen - New Metroline, M5 Civil Works South
Opportunity Score
Why this score?
Opportunity
60 / 100
Complexity
85 / 100
Risk factors
Requires completion of two metro projects (one underground, one above-ground) in the last 15 years with specific design...
Large-scale infrastructure with tunnels, stations, viaducts, and multiple interfaces. Design & build under ABT18 adds c...
Submission deadline in 3 days
Deep Portfolio Analysis
Uses:
- Description
- Industries & Services
- Capabilities
- Market & Experience
- Certifications
Overview
Moderate opportunityKey Facts
- EUR 800M estimated value
- Works contract
- 1 lot
- Duration 9 YEAR
- Design and build of approx. 6.5 km twin bored tunnels
- Construction of 5 underground stations (including 3 transfer stations)
Show full summary
Large-scale design and build tender for the M5 Civil Works South package in Copenhagen, Denmark. The project includes approximately 6.5 km twin bored tunnels, 5 underground stations, 2 km viaduct, and associated structures. The contract is structured as a design & build under ABT18 terms, with a negotiated procedure involving three rounds. Estimated value is €800 million. Deadline for initial tender submission is 15 December 2026, with award expected in December 2027. Only one lot is identified.
Risks
Requires completion of two metro projects (one underground, one above-ground) in the last 15 years with specific design...
Large-scale infrastructure with tunnels, stations, viaducts, and multiple interfaces. Design & build under ABT18 adds c...
Submission deadline in 3 days
Analysis may be incomplete
Only part of the procurement documentation was analyzed. Additional eligibility requirements, certificates, or submission documents may exist in the remaining tender documentation.
Key Requirements
Technical
- Design & build contract under ABT18 terms
- Negotiated procedure with three negotiation rounds
- EU funded project
Requirements may be incomplete.
Award Criteria
Lot 1
Buyer
Location
København S, DNK
Website
Buyer profile
Identifier
30823699
Activity
General public services
Lots (1)
LOT-0001
Copenhagen - New Metroline, M5 Civil Works South.
Single lot covering the southern section of the M5 metro line, including twin bored tunnels, underground and elevated stations, viaduct, crossovers, cross passages, ramp, and embankment sections. Phase 1 of the M5 project, with operational commencement anticipated in 2036.
EUR 800M
Estimated value
Location
Duration
Category
Award Criteria
Deadline
Award details
Schedule of Prices
The sub-criterion Quality comprises of: Technical solution and planning, 16% Management and collaboration, 16% Organization and key personnel, 10% Carbon, 8%
Additional CPV codes
Value note
Show original TED data
Original TED description
This tender presents a substantial opportunity for prospective contractors to bid for the M5 Civil Works South (CWS) package, an important component of the Copenhagen metro system's expansion. This project is of significant strategic importance, as the M5 line is a fully automated driverless metro system that will not only enhance passenger service on existing metro corridors but also extend connectivity to emerging urban development areas, including Kløverparken, Refshaleøen, and Lynetteholm in the East Harbour. The M5 is designed to operate as an independent system, ensuring that its construction and subsequent operation do not disrupt the existing M1-M4 metro lines. MAIN COMPONENTS OF THE M5 CIVIL WORK The M5 south consists of approx 6.5 km twin bored tunnels, 5 underground stations(incl. 3 transfer stations),2 underground crossovers,5 cross passages,1 ramp, approx 2.0 km viaduct,1 elevated station, 1 viaduct cross-over,1 elevated bifurcation, short embankment sections. For further details on scope ref. is made to M5-2.1-CMBS-SW and M5-2.2-CWS-SW PHASES: The current tender, Phase 1, encompasses the southern section of the line, from north-west of København H to north of v/Prags Boulevard, with an anticipated operational commencement in 2036. The broader vision includes phase 2 north of v/Prags Boulevard to Lynetteholm opening in 2045 and a potential future extension to form a ring line, signifying a long-term commitment to urban mobility. Phase 2 is not included in this tender. CONTRACT SPLIT OF M5: The M5 project as a whole consists of several contracts: • M5 Civil Works South (this contract) • M5 Transportation System South contract (tendered out as a separate contract in parallel with M5 Civil Works South) • Operation and Maintenance South contract (will be tendered out at a later stage) • Enabling Works contracts, e.g. relocation of utilities, relocation works at Kh etc. (enabling works will be tendered out in separate contracts) • Station and Shaft areas (will be tendered out at a later stage) • Canopy contracts (will be tendered out at a later stage). CONTRACT The contract is structured as a design & build contract under ABT18 terms, placing comprehensive responsibility for both design and execution upon the Contractor. This two-phase approach—design followed by execution—is a standard framework for complex infrastructure projects. An extensive market dialogue has been carried out before issuing the tender. The purpose of the market dialogue was to learn from the market what would constitute an attractive contract. Metroselskabet I/S is grateful for all the potential tenderers who took their time to participate in the dialogue and those provided input. INDICATIVE TIMESCHEDULE FOR THE PROCUREMENT Issue of invitation to tender September 29 2026 Launch meeting (individual meetings) October 27 – 29 2026 Deadline for submission of initial tender (submission 1): December 15. 2026 at 14:00 (local Danish time) Negotiation meetings January 4. – April 24 2027 Issue of addendum to tender documents May 4 2027 Deadline for submission of revised tender 1 July 26-28 2027 Negotiation meetings August 23-25 2027 Deadline for submission of revised tender 2 October 4-6 2027 Negotiation meetings October 19-21 2027 Deadline for submission of revised tender 3 November 9-11 2027 Notification of award decision December 20 2027 Expiry of standstill period December 30 2027 Signing of Contract Agreement February 2028 The time-schedule may be subject to change. Changes to the timeschedule will be made available in Byggeprojekt.dk.
Procurement Details
- Publication date
- 06 Jul 2026
- Languages
- English
Reference metadata
- Legal basis
- 32014L0025
Reference IDs
- Tender ID
- 466390-2026
Documents (1)
Similar tenders
Poland – Road construction works – Rozbudowa drogi krajowej nr 22 na odcinku Malbork -Królewo
Germany – Track construction works – GMT 2027 Paket 4 - 3 Lose Region S, SW, SW
Denmark – Partially underground railway works – Copenhagen - New Metroline, M5 Transportation System
France – Railway tunnel construction work – Adaptation de la ligne 7 à l’arrivée du MF19 Lot TxT 01 Génie Civil Création d’un tunnel d’accès à l’Atelier (AMT) sur le site de La Courneuve
Spain – Construction supervision services – Servicio de control y vigilancia de las obras correspondientes al Proyecto 04/26 de almenara del Nuevo Canal de Cartagena en el recinto de Lo Romero I. (MU/Varios)
Spain – Track construction works – Acuerdo Marco para la homologación de empresas para la ejecución de obras a las instalaciones de vía al ámbito de Red Ferroviaria de Ferrocarriles de la Generalitat de Cataluña (AM14/26)
Opportunity Score
Why this score?
Opportunity
60 / 100
Complexity
85 / 100
Risk factors
Requires completion of two metro projects (one underground, one above-ground) in the last 15 years with specific design...
Large-scale infrastructure with tunnels, stations, viaducts, and multiple interfaces. Design & build under ABT18 adds c...
Submission deadline in 3 days