Construction of BESS Stare Bogaczowice II with associated infrastructure

TAURON BME7 sp. z o.o.·Katowice, Poland·Expired · Jul 27, 2026·Open·Works
Original notice title

Poland – Construction work – Budowa bateryjnego systemu magazynowania energii elektrycznej BESS Stare Bogaczowice II wraz z infrastrukturą towarzyszącą

61/100

Opportunity Score

Needs reviewHigh complexity
WorksExpired
Why this score?

Opportunity

61 / 100

Complexity

68 / 100

Risk factors

The SWZ/specification and annexes are referenced, but no extracted tender document text was provided for analysis.

A bid security of PLN 3,500,000.00 is required according to the XML notice.

Deep Portfolio Analysis

Deep Company Fit Analysis

Uses:

  • Description
  • Industries & Services
  • Capabilities
  • Market & Experience
  • Certifications

Overview

Moderate opportunity

Key Facts

  • Works contract
  • 1 lot
  • Duration until Oct 2028
  • Construction of a battery energy storage system (BESS) with associated infrastructure.
  • Works related to electrical infrastructure, transformers, distribution/control apparatus, cables, batteries, inverters, site preparation and electrical installation.
Show full summary

Open EU-sector works contract for construction of a BESS energy storage system with associated infrastructure in Mokrzeszów, Poland. One lot is shown. Submission is electronic via the TAURON procurement platform. The notice is in Polish and key procurement rules are partly only described in the SWZ/SIWZ, which was not provided as analyzed text.

Risks

The SWZ/specification and annexes are referenced, but no extracted tender document text was provided for analysis.

A bid security of PLN 3,500,000.00 is required according to the XML notice.

Analysis may be incomplete

Only part of the procurement documentation was analyzed. Additional eligibility requirements, certificates, or submission documents may exist in the remaining tender documentation.

Key Requirements

Eligibility

  • The contracting authority intends to use Article 139 PZP: it will first evaluate offers and then check exclusion grounds and selection conditions for the highest-ranked bidder.

Administrative

  • Electronic submission is required.
  • Bid security (wadium) of PLN 3,500,000.00 is stated in the XML notice; timing, place and form are to be set out in the SWZ.

Award Criteria

Lot 1

Price (weight 80%, code per-exa)80%Quality: warranty (weight 5%, code per-exa)5%Quality: technical parameters (weight 5%, code per-exa)5%Quality: origin of components and services (weight 10%, code per-exa)10%

Buyer

Location

Katowice, POL

Buyer profile

Open profile

Identifier

NIP 6343042679

Activity

Electricity-related activities

Lots (1)

LOT-0001

Construction of BESS Stare Bogaczowice II with associated infrastructure

Works contract for construction of a battery energy storage system (BESS) Stare Bogaczowice II together with associated infrastructure. Scope appears to include construction/installation works and related electrical equipment, based on the classification codes and notice text. Performance location is Mokrzeszów, Poland. This lot is stated as not a framework agreement and not a DPS.

WorksEU fundedElectronic submission

Location

Mokrzeszów, Poland

Duration

Nov 2026 - Oct 2028

Category

Construction work

Award Criteria

Best price-quality ratio

Deadline

Expired Jul 27, 2026

Procurement Details

Publication date
06 Jul 2026
Languages
Polish

Reference metadata

Legal basis
32014L0025

Reference IDs

Tender ID
465749-2026

Documents (2)

Similar tenders