VDE 8.1 Nürnberg - Bamberg / Einbau Ausgleichsplatte sowie weitere Bauleistungen EÜ Regnitzbrücke
Original notice title
Germany – Construction work for bridges – VDE 8.1 Nürnberg - Bamberg / Einbau Ausgleichsplatte sowie weitere Bauleistungen EÜ Regnitzbrücke
Opportunity Score
Why this score?
Opportunity
30 / 100
Complexity
60 / 100
Risk factors
Only 24 days from publication (2026-07-07) to submission (2026-07-31), which may be insufficient for preparing a compli...
No estimated contract value provided, making it difficult to assess financial viability or competitiveness.
Deep Portfolio Analysis
Uses:
- Description
- Industries & Services
- Capabilities
- Market & Experience
- Certifications
Overview
Moderate opportunityKey Facts
- Works contract
- 1 lot
- Duration until Feb 2027
- Installation of a compensation slab
- Construction of approximately 170 meters of track (conventional ballasted track, category Strecken II, mixed traffic 121-160 km/h)
Show full summary
Open tender by DB InfraGO AG for bridge construction works on the VDE 8.1 Nürnberg-Bamberg line, specifically installation of a compensation slab and additional works (approx. 170m track, equipment, drainage, cable trenching, and defect remediation) at the Regnitzbrücke bridge in Fürth, Germany. Single lot, EU-funded (conflict with XML notice), price-only award criteria, short deadline (~24 days), and mandatory prequalification with DB InfraGO. No estimated value disclosed.
Risks
Only 24 days from publication (2026-07-07) to submission (2026-07-31), which may be insufficient for preparing a compli...
No estimated contract value provided, making it difficult to assess financial viability or competitiveness.
Analysis may be incomplete
Only part of the procurement documentation was analyzed. Additional eligibility requirements, certificates, or submission documents may exist in the remaining tender documentation.
Key Requirements
Technical
- Mandatory prequalification with DB InfraGO AG for the specific works (track, structural engineering, cable systems)
- Variants are allowed
Administrative
- Security guarantees as per tender documents
Requirements may be incomplete.
Award Criteria
Lot 1
Buyer
Location
Frankfurt Main, DEU
Identifier
fb197f94-7578-4673-8a57-4642ae120532
Activity
Railway services
Lots (1)
LOT-0001
VDE 8.1 Nürnberg - Bamberg / Einbau Ausgleichsplatte sowie weitere Bauleistungen EÜ Regnitzbrücke
Installation of a compensation slab, construction of approx. 170 m of track, equipment, drainage, cable trenching, and repair of structural defects at the Regnitzbrücke bridge.
Location
Duration
Category
Award Criteria
Deadline
Award details
Preis
Value note
Show original TED data
Original TED description
Einbau einer Ausgleichsplatte – Herstellung von ca. 170m Gleis - Zusätzlich erfolgen Ausstattungs-, Entwässerungs- und Kabeltiefbauarbeiten sowie die Beseitigung von Bauwerksmängeln.
Procurement Details
- Publication date
- 06 Jul 2026
- Languages
- German
Reference metadata
- Legal basis
- 32014L0025
Reference IDs
- Tender ID
- 465321-2026
Documents (1)
Similar tenders
Poland – Cycle path construction work – Regionalne ścieżki rowerowe VeloMałopolska: budowa trasy VeloSkawa na odcinku Graboszyce – Podolsze
Belgium – Construction work for bridges – 57/53/2/24/016 - L27A km 44.835 ONB Luitenant Nayaertplein L27A km 45.066 ONB Oudstrijdersstraat Bouw van een onafhankelijk werkend brugdeel in L27A Werken Burgerlijke Bouwkunde, Spoorwerken, Bovenleidingswerken, Seininrichtings-werken en kabelwerken
France – Restructuring work – 26M0133AOO-Restructuration des ateliers du Sang de Serp
Italy – Road construction works – PA 11/26 - S.S. 640 " Caltanissetta - Agrigento" Lavori di ricostruzione del Viadotto San Giuliano esistente, lungo la SS 640 Caltanissetta - Agrigento dal km 62+720 al km 63+900 di competenza del C.M. "E".
Netherlands – Bridge renewal construction work – 31194052: Vernieuwingsopgave Verkeersbrug Dordrecht
Netherlands – Construction, foundation and surface works for highways, roads – 1-W-0027920-25 Aanleg Verlegde Bosdreef- fase 2
Opportunity Score
Why this score?
Opportunity
30 / 100
Complexity
60 / 100
Risk factors
Only 24 days from publication (2026-07-07) to submission (2026-07-31), which may be insufficient for preparing a compli...
No estimated contract value provided, making it difficult to assess financial viability or competitiveness.
Deep Portfolio Analysis
Uses:
- Description
- Industries & Services
- Capabilities
- Market & Experience
- Certifications