Work must be staged in an active hospital with 24-hour staffed operations and minimal downtime requirements.
The notice mentions a 5-year service and maintenance contract, but the full commercial and technical terms are not prov...
Submission deadline in 11 days
Deep Portfolio Analysis
Uses:
- Description
- Industries & Services
- Capabilities
- Market & Experience
- Certifications
Overview
Moderate opportunityKey Facts
- Works contract
- 1 lot
- Duration 7 YEAR
- Demolition of six existing passenger/bed lifts from 1978.
- Installation of new lifts in the existing shafts at Førde Central Hospital.
Show full summary
Open works tender in Norway for a turnkey replacement of 6 existing lifts at Førde Central Hospital, including demolition of the old lifts, installation of new lifts in existing shafts, staged execution, and a 5-year service and maintenance contract. Submission is electronic and the deadline is 2026-09-01 10:00 UTC. No contract value is provided in the structured data or XML notice.
Risks
Work must be staged in an active hospital with 24-hour staffed operations and minimal downtime requirements.
The notice mentions a 5-year service and maintenance contract, but the full commercial and technical terms are not prov...
Submission deadline in 11 days
Analysis may be incomplete
Only part of the procurement documentation was analyzed. Additional eligibility requirements, certificates, or submission documents may exist in the remaining tender documentation.
Key Requirements
Technical
- The contract is a turnkey contract and the contractor is responsible for construction work.
- Execution must account for continuous 24-hour hospital operations.
Administrative
- Electronic submission is required.
Buyer
Location
VADSØ, NOR
Buyer profile
Identifier
916879067
Activity
Health
Lots (1)
LOT-0001
Replacement of 6 lifts at Førde Central Hospital
Turnkey replacement of six passenger/bed lifts in the Central Block of Førde Central Hospital. Scope includes demolition of the current lifts, installation of new lifts in existing shafts, staged execution to minimise downtime, and consideration of 24-hour hospital operations. A 5-year service and maintenance contract is also mentioned. Source: structured data and XML notice.
Location
Duration
Category
Deadline
Award details
The objective of the procurement is to replace six existing passenger lifts/bed lifts from 1978. The lifts are located in the Central Block by Førde Central Hospital. The lifts have large traffic distributed over 9 floors with approx. 6-7,000 lift movements in a 24 hour period. The lifts have a payload of 1,200 kg per lift and are used by employees, patients and visitors at the hospital. All lifts have nine stops with through doors except level 0, 1 and 2 with fewer number of doors. The current lifts shall be demolished and new lifts that shall be assembled in the existing shafts shall be installed. The aim of the replacement is to install new passenger lifts for passenger and bed transport that are suitable for hospital operation. Tenderers shall take into account 24 hour staffed activities in connection with engineering design services and execution. The replacement shall be carried out in stages. Minimal downtime is crucial for the contracting authority as the lifts are frequently used by employees, patients and guests. The contract shall be carried out as a Turnkey contract where the Turnkey Contractor is also responsible for the construction work. A 5 year service and maintenance contract shall also be signed.
Additional CPV codes
Value note
Show original TED data
Original lot title
Open tender contest for the replacement of 6 lifts at Førde Central Hospital.
Original TED description
The objective of the procurement is to replace six existing passenger lifts/bed lifts from 1978. The lifts are located in the Central Block by Førde Central Hospital. The lifts have large traffic distributed over 9 floors with approx. 6-7,000 lift movements in a 24 hour period. The lifts have a payload of 1,200 kg per lift and are used by employees, patients and visitors at the hospital. All lifts have nine stops with through doors except level 0, 1 and 2 with fewer number of doors. The current lifts shall be demolished and new lifts that shall be assembled in the existing shafts shall be installed. The aim of the replacement is to install new passenger lifts for passenger and bed transport that are suitable for hospital operation. Tenderers shall take into account 24 hour staffed activities in connection with engineering design services and execution. The replacement shall be carried out in stages. Minimal downtime is crucial for the contracting authority as the lifts are frequently used by employees, patients and guests. The contract shall be carried out as a Turnkey contract where the Turnkey Contractor is also responsible for the construction work. A 5 year service and maintenance contract shall also be signed.
Procurement Details
- Publication date
- 05 Jul 2026
- Languages
- English, Norwegian
Reference metadata
- Legal basis
- 32014L0024
Reference IDs
- Tender ID
- 462880-2026
Documents (2)
Similar tenders
Germany – Lift installation work – 0039 - Rottal-Inn Kliniken KU Eggenfelden - Neubau OP-/Intensivabteilung - Aufzugsanlagen
France – Multi-dwelling buildings construction work – Construction de 16 logements collectifs et 16 parkings en sous-sols sis 11 et 13 rue Conet - 77130 CANNES ECLUSE Marché en corps d'état séparés
France – Construction work for multi-dwelling buildings and individual houses – MARCHE DE TRAVAUX POUR LA CONSTRUCTION DE 44 LOGEMENTS COLLECTIFS, UN LOCAL D'ACTIVITE EN RDC ET 37 PLACES DE STATIONNEMENT SUR UN NIVEAU DE SOUS-SOL A CACHAN (94)
France – Restructuring work – RESTRUCTURATION DES ARCHIVES DEPARTEMENTALES DE LA HAUTE-GARONNE - 11 et 14 BOULEVARD GRIFFOUL DORVAL A TOULOUSE - TRAVAUX 8 LOTS
France – Lift installation work – Travaux de remplacement complet de 258 ascenseurs sur le patrimoine du groupe Valophis
Norway – Lifts – Framework agreement for lift service
Opportunity Score
Why this score?
Opportunity
66 / 100
Complexity
80 / 100
Risk factors
Work must be staged in an active hospital with 24-hour staffed operations and minimal downtime requirements.
The notice mentions a 5-year service and maintenance contract, but the full commercial and technical terms are not prov...
Submission deadline in 11 days
Deep Portfolio Analysis
Uses:
- Description
- Industries & Services
- Capabilities
- Market & Experience
- Certifications