Tenderwize
Back to tender search

Design and construction of railway lines 623 and 628: Fornale-Szczyrzyc and Porąbka-Stróża

PKP Polskie Linie Kolejowe S.A.·Warszawa, Poland·Expired · Jul 21, 2026·Open·Works
Original notice title

Poland – Construction work – Zaprojektowanie (w zakresie branży srk) i kompleksowe wykonanie robót budowlanych na linii kolejowej nr 623 i nr 628 na odcinku I+K podg. Fornale – Szczyrzyc i podg. Porąbka – podg. Stróża w ramach Projektu pn. „Budowa nowej linii kolejowej Podłęże – Szczyrzyc – Tymbark / Mszana Dolna oraz modernizacja istniejącej linii kolejowej nr 104 Chabówka – Nowy Sącz – Etap II”

40/100

Opportunity Score

Needs reviewHigh complexity
WorksExpired
Why this score?

Opportunity

40 / 100

Complexity

90 / 100

Risk factors

Short submission period (18 days) may not be sufficient to prepare a comprehensive bid for such a complex project.

Extensive experience and financial requirements may exclude many potential bidders.

Deep Portfolio Analysis

Deep Company Fit Analysis

Uses:

  • Description
  • Industries & Services
  • Capabilities
  • Market & Experience
  • Certifications

Overview

Moderate opportunity

Key Facts

  • Works contract
  • 1 lot
  • Duration 46 MONTH
  • Design and construction of railway line No. 623 (approx. 9.7 km) and connecting line No. 628 (approx. 1.5 km)
  • Works include track, drainage, roads, signaling (SRK), telecommunications, traction power, electrical, engineering structures (bridges, tunnels), platforms, crossings, environmental works
Show full summary

Design and construction of railway lines No. 623 and No. 628 in Poland, including track, signaling, traction, telecommunications, bridges, tunnels, and stations. The contract includes design, construction, and compliance assessment. An option for interface works is foreseen. The procedure is open, with a single lot. Estimated value is not provided. The deadline for submission is 21 July 2026 (time mismatch between notice sources). The buyer is PKP Polskie Linie Kolejowe S.A. The project is EU-funded.

Risks

Short submission period (18 days) may not be sufficient to prepare a comprehensive bid for such a complex project.

Extensive experience and financial requirements may exclude many potential bidders.

Analysis may be incomplete

Only part of the procurement documentation was analyzed. Additional eligibility requirements, certificates, or submission documents may exist in the remaining tender documentation.

Key Requirements

Technical

  • Design and construction of new railway infrastructure
  • Compliance with EU and Polish railway standards
  • Provision of performance bond and warranty

Award Criteria

Lot 1

Price only: 100% weight on total gross price including optional works.100%

Buyer

Location

Warszawa, POL

Buyer profile

Open profile

Identifier

NIP 113-23-16-427, REGON 017319027

Activity

Railway services

Lots (1)

LOT-0001

Design and construction of railway lines 623 and 628: Fornale-Szczyrzyc and Porąbka-Stróża

Design and comprehensive construction of railway line No. 623 (approx. 9.7 km) and connecting line No. 628 (approx. 1.5 km), including track, drainage, roads, signaling (SRK), telecommunications, traction power, electrical, engineering structures (bridges, tunnels), platforms, crossings, environmental works, and compliance verification. Includes an option for interface works with other contractors. Duration 46 months.

WorksEU fundedElectronic submission

Location

PL214, Poland

Duration

46 MONTH

Category

Construction work

Award Criteria

Price

Deadline

Expired Jul 21, 2026

Procurement Details

Publication date
05 Jul 2026
Languages
Polish

Reference metadata

Legal basis
32014L0025

Reference IDs

Tender ID
461125-2026

Documents (2)

Similar tenders