Tenderwize
Back to tender search

Improvement and Modernization of Water Supply Systems of Petra and Mithymna

ΔΙΑΔΗΜΟΤΙΚΗ ΕΠΙΧΕΙΡΗΣΗ ΥΔΡΕΥΣΗΣ - ΑΠΟΧΕΤΕΥΣΗΣ ΛΕΣΒΟΥ (ΔΕΥΑΛ)·ΜΥΤΙΛΗΝΗ, Greece·EUR 896.4k·Deadline Sep 11, 2026 · 18 days left·Open·Services
Structured notice only
Original notice title

Greece – Engineering design services – ΜΕΛΕΤΗ ΜΕ ΤΙΤΛΟ «ΒΕΛΤΙΩΣΗ ΚΑΙ ΕΚΣΥΓΧΡΟΝΙΣΜΟΣ ΥΔΡΑΓΩΓΕΙΟΥ Δ.Ε. ΠΕΤΡΑΣ ΚΑΙ ΜΗΘΥΜΝΑΣ»

55/100

Opportunity Score

Needs reviewMedium complexity
ServicesOpen
Why this score?

Opportunity

55 / 100

Complexity

60 / 100

Risk factors

Procurement documents are available at www.promitheus.gov.gr but were not analyzed. Important details on eligibility, s...

Minor inconsistency between structured data (20:59 UTC) and XML notice (23:59 Athens time). The actual deadline appears...

Deep Portfolio Analysis

Deep Company Fit Analysis

Uses:

  • Description
  • Industries & Services
  • Capabilities
  • Market & Experience
  • Certifications

Overview

Moderate opportunity

Key Facts

  • EUR 896.4k estimated value
  • Services contract
  • 1 lot
  • Duration 15 MONTH
  • Complete engineering design services for new internal water supply networks and reservoirs
  • Design of new external water supply networks
Show full summary

This tender, published by the Intermunicipal Water Supply and Sewerage Enterprise of Lesvos (DEYAL), is for engineering design services for the improvement and modernization of the water supply systems of the Municipal Units of Petra and Mithymna. The contract includes complete construction studies (hydraulic, electromechanical, topographic, environmental, geotechnical, etc.) for new internal and external water supply networks, reservoirs, and wastewater treatment plants. The estimated value is €896,449.96. The procedure is open, and the contract is EU-funded. Submission is electronic via www.promitheus.gov.gr. The deadline is 11 September 2026 at 23:59 (Athens time). The analysis is based solely on the structured data and XML notice; procurement documents were not analyzed.

Risks

Procurement documents are available at www.promitheus.gov.gr but were not analyzed. Important details on eligibility, s...

Minor inconsistency between structured data (20:59 UTC) and XML notice (23:59 Athens time). The actual deadline appears...

Analysis may be incomplete

Only part of the procurement documentation was analyzed. Additional eligibility requirements, certificates, or submission documents may exist in the remaining tender documentation.

Key Requirements

Technical

  • Single lot covering all design services for the specified infrastructure
  • Contract duration: 15 months (structured data) or 18 months (XML notice - inconsistency noted)
  • EU-funded project

Requirements may be incomplete.

Award Criteria

Lot 1

Quality criterion (most economically advantageous tender based on best price-quality ratio)Price criterion (most economically advantageous tender based on best price-quality ratio)

Buyer

Location

ΜΥΤΙΛΗΝΗ, GRC

Identifier

1007.F01064.0001

Activity

General public services

Lots (1)

LOT-0001

Improvement and Modernization of Water Supply Systems of Petra and Mithymna

Full engineering design services for construction works: new internal/external water supply networks, reservoirs, wastewater treatment plants (MEN) for Mithymna and Petra, and associated networks. Includes hydraulic, electromechanical, topographic, environmental, chemical-technical, geological, and geotechnical studies.

ServicesEU fundedElectronic submission

EUR 896.5k

Estimated value

Location

Δ.Ε. ΠΕΤΡΑΣ ΚΑΙ ΜΗΘΥΜΝΑΣ, Greece

Duration

15 MONTH

Category

Engineering design services

Award Criteria

Best price-quality ratio

Deadline

Deadline Sep 11, 2026

Procurement Details

Publication date
02 Jul 2026
Languages
Greek

Reference metadata

Legal basis
32014L0024

Reference IDs

Tender ID
457598-2026

Documents (1)

Similar tenders