Construction of heat pumps 3x200 kW in Dobrzański heating plant – MPEC Nowy Sącz
Original notice title
Poland – Heat pumps – BUDOWA POMP CIEPŁA O MOCY 3 × 200 KW W ELEKTROCIEPŁOWNI DOBRZAŃSKIEGO – MPEC NOWY SĄCZ
Opportunity Score
Why this score?
Opportunity
30 / 100
Complexity
50 / 100
Risk factors
Only 7 days from publication to submission (2026-07-02 to 2026-07-09). Insufficient time for thorough proposal preparat...
No estimated contract value provided, making it difficult to assess financial scale, bond requirements, or cost competi...
Deep Portfolio Analysis
Uses:
- Description
- Industries & Services
- Capabilities
- Market & Experience
- Certifications
Overview
Moderate opportunityKey Facts
- Supplies contract
- 1 lot
- Duration until Jun 2027
- Supply and installation of three heat pumps (3 x 200 kW total capacity)
- Construction works for power plants and heating plants (CPV 45251000)
Show full summary
This tender by MPEC Nowy Sącz concerns the construction of heat pumps with a total capacity of 3 x 200 kW in the Dobrzański heating plant. The contract covers the supply, installation, and related construction works. The procedure is open and EU-funded. The award is based solely on price (100%). The deadline for submission is very short (7 days from publication). The estimated contract value is not disclosed. Only Polish language is accepted. A performance guarantee is required.
Risks
Only 7 days from publication to submission (2026-07-02 to 2026-07-09). Insufficient time for thorough proposal preparat...
No estimated contract value provided, making it difficult to assess financial scale, bond requirements, or cost competi...
Analysis may be incomplete
Only part of the procurement documentation was analyzed. Additional eligibility requirements, certificates, or submission documents may exist in the remaining tender documentation.
Key Requirements
Technical
- Deadline: 2026-07-09 10:00 CET (very short, ~7 days from publication)
Administrative
- Electronic submission via Open portal
- Polish language only
Requirements may be incomplete.
Award Criteria
Lot 1
Buyer
Name
Miejskie Przedsiębiorstwo Energetyki Cieplnej Spółka z ograniczoną odpowiedzialnością w Nowym Sączu
Location
Nowy Sącz, POL
Identifier
NIP: 734-17-87-660
Activity
Economic affairs
Lots (1)
LOT-0001
Construction of heat pumps 3x200 kW in Dobrzański heating plant – MPEC Nowy Sącz
Supply and installation of heat pumps (3 x 200 kW) including related construction, heating plant construction, and HVAC installation work in Nowy Sącz. Detailed scope is defined in procurement documents.
Location
Duration
Category
Award Criteria
Deadline
Award details
Cena brutto za całość zamówienia – waga 100%, sposób oceny minimalizacja
Additional CPV codes
Value note
Show original TED data
Original lot title
BUDOWA POMP CIEPŁA O MOCY 3 × 200 KW W ELEKTROCIEPŁOWNI DOBRZAŃSKIEGO – MPEC NOWY SĄCZ
Original TED description
BUDOWA POMP CIEPŁA O MOCY 3 × 200 KW W ELEKTROCIEPŁOWNI DOBRZAŃSKIEGO – MPEC NOWY SĄCZ Szczegółowy zakres oraz wymagania realizacji przedmiotu określone zostały w dokumentach zamówienia.
Procurement Details
- Publication date
- 02 Jul 2026
- Languages
- Polish
Reference metadata
- Legal basis
- 32014L0025
Reference IDs
- Tender ID
- 457178-2026
Documents (2)
Similar tenders
France – Construction work – Nantes - Cité des Imaginaires - Travaux de restructuration du CAP 44
France – Restructuring work – RESTRUCTURATION DES ARCHIVES DEPARTEMENTALES DE LA HAUTE-GARONNE - 11 et 14 BOULEVARD GRIFFOUL DORVAL A TOULOUSE - TRAVAUX 8 LOTS
France – Repair and maintenance services of central heating – Contrat d'exploitation et de maintenance de chaufferies collectives
Sweden – Heating, ventilation and air-conditioning installation work – Ventilations-entreprenör FO Öst
Sweden – Heating, ventilation and air-conditioning installation work – VS-entreprenör FO Öst
France – Multi-dwelling buildings construction work – Construction de 16 logements collectifs et 16 parkings en sous-sols sis 11 et 13 rue Conet - 77130 CANNES ECLUSE Marché en corps d'état séparés
Opportunity Score
Why this score?
Opportunity
30 / 100
Complexity
50 / 100
Risk factors
Only 7 days from publication to submission (2026-07-02 to 2026-07-09). Insufficient time for thorough proposal preparat...
No estimated contract value provided, making it difficult to assess financial scale, bond requirements, or cost competi...
Deep Portfolio Analysis
Uses:
- Description
- Industries & Services
- Capabilities
- Market & Experience
- Certifications