Construction of 10 MW biomass plant in Koszalin

Miejska Energetyka Cieplna Sp. z o.o. w Koszalinie·Koszalin, Poland·Expired · Jul 20, 2026·Open·Works
Structured notice only
Original notice title

Poland – Heating plant construction work – Budowa instalacji spalania biomasy o mocy 10 MW w Koszalinie, ul. Mieszka I 20A, Kotłownia DPM

40/100

Opportunity Score

Needs reviewHigh complexity
WorksExpired
Why this score?

Opportunity

40 / 100

Complexity

75 / 100

Risk factors

High bid bond and financial capacity requirements may strain cash flow and limit participation.

Strict experience requirements (biomass boiler ≥5 MWt) may be difficult to prove.

Deep Portfolio Analysis

Deep Company Fit Analysis

Uses:

  • Description
  • Industries & Services
  • Capabilities
  • Market & Experience
  • Certifications

Tender facts

Contracting authority
Miejska Energetyka Cieplna Sp. z o.o. w Koszalinie
Country
Poland
CPV
45251200 - Heating plant construction work +34 more
Deadline
Jul 20, 2026

Overview

Moderate opportunity

Key Facts

  • Works contract
  • 1 lot
  • Duration until Jan 2028
  • Design and construction of a complete 10 MW biomass combustion installation
  • Stage 1: Preparation of design documentation, obtaining building permit
Show full summary

This tender is an open procedure for the design and construction (design-and-build) of a 10 MW biomass combustion installation in Koszalin, Poland. The project is EU-funded under the Polish Recovery and Resilience Plan (KPO). The contract is divided into two stages: Stage 1 (design) and Stage 2 (construction). The award is based 100% on price. Key requirements include a bid bond of 800,000 PLN, financial capacity of at least 15,000,000 PLN, liability insurance of 15,000,000 PLN, relevant experience in biomass boiler projects, and specific key personnel. The submission deadline is 20 July 2026, approximately 18 days after publication.

Risks

High bid bond and financial capacity requirements may strain cash flow and limit participation.

Strict experience requirements (biomass boiler ≥5 MWt) may be difficult to prove.

Analysis may be incomplete

Only part of the procurement documentation was analyzed. Additional eligibility requirements, certificates, or submission documents may exist in the remaining tender documentation.

Key Requirements

Technical

  • Bid bond of 800,000 PLN
  • Financial capacity or credit line of at least 15,000,000 PLN
  • Liability insurance with minimum sum of 15,000,000 PLN

Requirements may be incomplete.

Award Criteria

Lot 1

Price 100% - lowest price receives maximum points. — 100%

Buyer

Location

Koszalin, POL

Buyer profile

Open profile

Identifier

NIP:6690501466; REGON:330091493

Activity

Economic affairs

Lots (1)

LOT-0001

Construction of a 10 MW biomass combustion installation in Koszalin

Complete design and construction of a biomass combustion installation including: main building with boiler (10 MW), fuel handling system, flue gas cleaning, ash removal, heat recovery, and pumping station. The project is divided into two main stages: Stage 1 (design and permitting) and Stage 2 (construction and commissioning).

WorksEU fundedElectronic submissionSME suitable

Location

Koszalin, Poland

Duration

Aug 2026 - Jan 2028

Category

Heating plant construction work

Award Criteria

Price

Deadline

Expired Jul 20, 2026

Procurement Details

Publication date
02 Jul 2026
Languages
Polish

Reference metadata

Legal basis
32014L0025

Reference IDs

Tender ID
456858-2026

Documents (1)

Similar tenders

Poland – Multi-dwelling buildings construction work – Budowa dwóch budynków mieszkalnych wielorodzinnych (nr 2A i 2B) TBS w Jeleniej Górze w stanie surowym zamkniętym wraz z niezbędną infrastrukturą towarzyszącą – etap II oraz wykonaniem sieci i instalacji zewnętrznych i zagospodarowaniem terenu

Dec 10

Germany – Mechanical engineering installation works – Ahlbachgruppe - Neubau der Kläranlage - Pumpen, Rohrleitungen, Armaturen

Dec 7

Poland – Solar photovoltaic modules – Wykonanie instalacji OZE wraz z magazynem energii w ramach projektu nr FEDP.02.04-IZ.00-0031/24 pn. „Zwiększenie wykorzystania energii odnawialnej przez Szpital Wojewódzki w Łomży dzięki inwestycji w innowacyjne OZE wraz z magazynem energii” w ramach Programu Fundusze Europejskie dla Podlaskiego 2021-2027 Priorytetu II Region przyjazny środowisku Działania 2.4 Energia Odnawialna

Dec 11

Poland – Construction work – Wykonanie robót budowlanych polegających na termomodernizacji i przebudowie budynku wraz z infrastrukturą techniczną Zespołu Szkół Spożywczych przy ul. Toruńskiej 174 w Bydgoszczy.

Nov 23

Poland – Construction work – BZP.271.77.2026 „Wsparcie rozwoju gospodarczego obszaru rewitalizacji poprzez zagospodarowanie terenu Rynku Maślanego w Nowym Sączu” – w trybie „zaprojektuj i wybuduj”

Nov 20

Latvia – Installation services (except software) – Rekreācijas elementu izgatavošana un uzstādīšana Daugavpils valstspilsētas pašvaldības administratīvajā teritorijā

Dec 7