Construction of penstocks for hydro-mechanical structures
Original notice title
Iceland – Construction work for hydro-mechanical structures – HVM36 - Penstocks
Opportunity Score
Why this score?
Opportunity
30 / 100
Complexity
65 / 100
Risk factors
Penstocks design and installation require specialized hydro-mechanical expertise. Quality and performance risks if not...
Absence of estimated value and award criteria increases uncertainty in tender evaluation and financial planning.
Deep Portfolio Analysis
Uses:
- Description
- Industries & Services
- Capabilities
- Market & Experience
- Certifications
Tender facts
- Contracting authority
- Landsvirkjun
- Country
- Iceland
- CPV
- 45248000 - Construction work for hydro-mechanical structures
- Deadline
- Jul 21, 2026
Overview
Moderate opportunityKey Facts
- Works contract
- 1 lot
- Duration until Oct 2030
- Design, manufacture, shop testing, transport, installation, erection, field testing and commissioning of two steel penstocks with flow measurement systems
- Provision of all equipment, materials, engineering, temporary works, labour, supervision and services for a complete operational installation
Show full summary
Tender by Landsvirkjun for design, manufacture, installation, and commissioning of two steel penstocks with flow measurement systems for a hydro project in Iceland. Single lot, negotiated procedure with call for competition. Deadline for submissions: 2026-07-21. No estimated value or award criteria provided in available data.
Risks
Penstocks design and installation require specialized hydro-mechanical expertise. Quality and performance risks if not...
Absence of estimated value and award criteria increases uncertainty in tender evaluation and financial planning.
Analysis may be incomplete
Only part of the procurement documentation was analyzed. Additional eligibility requirements, certificates, or submission documents may exist in the remaining tender documentation.
Key Requirements
Technical
- Negotiated procedure with call for competition (neg-w-call)
Administrative
- Electronic submission required via In-Tend platform
- Language: English
Requirements may be incomplete.
Buyer
Name
Location
Reykjavík, ISL
Buyer profile
Identifier
4202691299
Activity
General public services
Lots (1)
LOT-0001
HVM36 - Penstocks
Design, manufacture, shop testing, delivery, installation, field testing and commissioning of two steel penstocks with flow measurement systems, including all related mechanical, electrical and instrumentation work. Completion from January 2027 to October 2030, with installation June 2028 to April 2030.
Location
Duration
Category
Deadline
Award details
The tender concerns the design, manufacture, shop testing, delivery, installation, field testing and commissioning of two steel penstocks with flow measurement systems. The work shall comprise the complete design, manufacture, shop testing, transport, installation, erection, field testing and commissioning of the penstocks and associated equipment, together with all equipment, materials, engineering, temporary works, labour, supervision and services required to provide a complete, satisfactory and fully operational installation. The scope shall include, but not be limited to, the penstocks with flow measurement systems and all related mechanical, electrical and instrumentation work necessary for the proper and reliable operation of the penstocks. Time for completion is estimated to be from January 2027 to October 2030, with installation of the penstocks over the period of June 2028 to April 2030.
Show original TED data
Original TED description
The tender concerns the design, manufacture, shop testing, delivery, installation, field testing and commissioning of two steel penstocks with flow measurement systems. The work shall comprise the complete design, manufacture, shop testing, transport, installation, erection, field testing and commissioning of the penstocks and associated equipment, together with all equipment, materials, engineering, temporary works, labour, supervision and services required to provide a complete, satisfactory and fully operational installation. The scope shall include, but not be limited to, the penstocks with flow measurement systems and all related mechanical, electrical and instrumentation work necessary for the proper and reliable operation of the penstocks. Time for completion is estimated to be from January 2027 to October 2030, with installation of the penstocks over the period of June 2028 to April 2030.
Procurement Details
- Publication date
- 01 Jul 2026
- Languages
- English
Reference metadata
- Legal basis
- 32014L0025
Reference IDs
- Tender ID
- 455109-2026
Documents (1)
Similar tenders
France – Construction work for water projects – 31 BAZACLE – Continuité écologique : amélioration dévalaison piscicole à l’usine du Bazacle (31)
France – Construction work for hydro-mechanical structures – Procédure formalisée
Slovakia – Reservoir construction works – Zlepšenie vodného hospodárstva v lesoch OZ Považie a OZ Východ
Opportunity Score
Why this score?
Opportunity
30 / 100
Complexity
65 / 100
Risk factors
Penstocks design and installation require specialized hydro-mechanical expertise. Quality and performance risks if not...
Absence of estimated value and award criteria increases uncertainty in tender evaluation and financial planning.
Deep Portfolio Analysis
Uses:
- Description
- Industries & Services
- Capabilities
- Market & Experience
- Certifications