Design and construction of traction power infrastructure for railway line 85 (Warsaw–Łódź)

Centralny Port Komunikacyjny sp. z o.o.·Warszawa, Poland·Deadline Aug 31, 2026 · 9 days left·Comp Dial·Works
Original notice title

Poland – Construction work – Opracowanie dokumentacji projektowej i realizacja robót budowlanych w zakresie podsystemu "Energia" - sieć trakcyjna na linii kolejowej nr 85 odc. Warszawa - Łódź

64/100

Opportunity Score

Needs reviewHigh complexity
WorksOpen
Why this score?

Opportunity

64 / 100

Complexity

88 / 100

Risk factors

This is a competitive dialogue with a later SWZ; bidders must qualify for dialogue before seeing final tender condition...

The notice states that some directly related documents are confidential or trade-secret material, and these were not pr...

Submission deadline in 9 days

Deep Portfolio Analysis

Deep Company Fit Analysis

Uses:

  • Description
  • Industries & Services
  • Capabilities
  • Market & Experience
  • Certifications

Overview

Moderate opportunity

Key Facts

  • Works contract
  • 1 lot
  • Duration until Dec 2032
  • Prepare project documentation for the Energy subsystem.
  • Construct traction network infrastructure for railway line 85.
Show full summary

This is a Polish competitive dialogue for design and construction works for the "Energy" subsystem of railway line no. 85 (Warsaw–Łódź), led by Centralny Port Komunikacyjny sp. z o.o. The contract covers project documentation, construction of traction power infrastructure, related works on PKP PLK infrastructure, EC verification certification, declarations, and documentation for authorization to operate the subsystem. The notice indicates one lot, electronic submission is required, and the procedure includes an invited-dialogue stage with a maximum of 5 participants selected if more candidates qualify. Contract value is not stated in the provided structured data or XML.

Risks

This is a competitive dialogue with a later SWZ; bidders must qualify for dialogue before seeing final tender condition...

The notice states that some directly related documents are confidential or trade-secret material, and these were not pr...

Submission deadline in 9 days

No procurement documents available

Analysis may be incomplete

Only part of the procurement documentation was analyzed. Additional eligibility requirements, certificates, or submission documents may exist in the remaining tender documentation.

Key Requirements

Technical

  • Candidates may be invited to the dialogue; the notice states a maximum of 5 participants if more than 5 qualified candidates apply.
  • Consortium bids are allowed.

Administrative

  • Electronic submission is required.

Award Criteria

Lot 1

Price (type: price, weight not stated)Quality criterion: completion time for general traction network design (weight not stated)Quality criterion: staff experience (weight not stated)Quality criterion: characteristics of key materials (weight not stated)Quality criterion: extension of quality warranty period (weight not stated)

Buyer

Location

Warszawa, POL

Buyer profile

Open profile

Identifier

PL 7010894497

Activity

General public services

Lots (1)

LOT-0001

Design and construction of traction power infrastructure for railway line 85 (Warsaw–Łódź)

Design documentation and construction works for the 'Energy' subsystem: traction network, power supply elements, autotransformer cabins, control of traction network switches, and necessary rebuilding of existing PKP PLK infrastructure at connection points. The scope also includes obtaining EC verification certification for the Energy subsystem, issuing verification declarations, and preparing documentation needed for operating authorization. Source: structured data and XML notice.

WorksEU fundedElectronic submission

Location

PL913, Poland

Duration

Dec 2027 - Dec 2032

Category

Construction work

Award Criteria

Best price-quality ratio

Deadline

Deadline Aug 31, 2026

Procurement Details

Publication date
30 Jun 2026
Languages
Polish

Reference metadata

Legal basis
32014L0025

Reference IDs

Tender ID
449352-2026

Documents (1)

Similar tenders

Poland – Construction work – Budowa systemu ładowania autobusów elektrycznych na terenie Oddziału Przewozów R-1 „Woronicza”

Sep 15

Poland – Electrical installation work – Rozbudowa infrastruktury ładowania autobusów elektrycznych na zajezdni autobusowej przy ul. Chemicznej w Zielonej Górze.

Aug 25

Netherlands – Engineering design services for mechanical and electrical installations for buildings – 23798 | Adviseur Procesinstallaties en Ontwerpen Elektrotechnische & Werktuigbouwkundige installaties t.b.v. Nieuwbouw Werkcentrum Vliegtuig Kunststoffen Schilderen Woensdrecht te Hoogerheide

Sep 18

Denmark – Partially underground railway works – Copenhagen - New Metroline, M5 Transportation System

Aug 25

Italy – Railway construction works – DAC.0031.2026 - Lavori di manutenzione comprendenti l'esecuzione di lavori autonomi ed a sé stanti di Molatura scambi e binari/itinerari/serraglie in ambito stazione/posto di servizio con riprofilatura della superficie di rotolamento delle rotaie stesse nell’ambito delle DOIT di Ancona, Bologna, Firenze, Milano, Napoli, Palermo, Roma Lotto 1 - Centro-Sud e Lotto 2 - Nord

Sep 14

Italy – Engineering design services for the construction of civil engineering works – PROGRAMMAZIONE FSC 2021 – 2027 - GARA EUROPEA A PROCEDURA APERTA PER L’AFFIDAMENTO DEI SERVIZI TECNICI DI PROGETTAZIONE, DIREZIONE LAVORI E COORDINAMENTO DELLA SICUREZZA IN FASE DI PROGETTAZIONE E ESECUZIONE RELATIVI ALL'INTERVENTO DENOMINATO: “VIABILITA' DI ACCESSO AL NUOVO OSPEDALE DI ANDRIA” - CUP: B81B24000700001

Sep 7