SDA+ Phase 2 - Experimentation of the Performance Evaluation Protocol for Detection-Stop Systems (SDA) for Onshore Wind Farms
Original notice title
France – Engineering studies – Programme SDA+ Phase 2 - Expérimentation du protocole d’évaluation de la performance des Systèmes de Détection-Arrêt (SDA) en « sortie d’usine » pour les parcs éoliens terrestres
Opportunity Score
Why this score?
Opportunity
50 / 100
Complexity
60 / 100
Risk factors
The absence of estimated value and award criteria in the notice increases uncertainty in bid preparation and evaluation.
The optional 17-month tranche may or may not be activated, affecting resource planning and pricing.
Deep Portfolio Analysis
Uses:
- Description
- Industries & Services
- Capabilities
- Market & Experience
- Certifications
Overview
Moderate opportunityKey Facts
- Services contract
- 1 lot
- Duration 49 MONTH
- Organize and implement test campaigns for the evaluation of Detection-Stop Systems (SDA) performance protocol at 'factory exit' for onshore wind farms.
- Analyze the results of the test campaigns.
Show full summary
ADEME is seeking a service provider to organize, implement, and analyze test campaigns for evaluating the performance of Detection-Stop Systems (SDA) for onshore wind farms as part of the SDA+ Phase 2 program. The contract includes a firm 32-month phase and an optional 17-month phase. The procedure is open, with electronic submission required. The notice lacks estimated value, award criteria details, and specific eligibility criteria, which are to be found in the procurement documents. EU funding is indicated (though XML states no EU funds).
Risks
The absence of estimated value and award criteria in the notice increases uncertainty in bid preparation and evaluation.
The optional 17-month tranche may or may not be activated, affecting resource planning and pricing.
Analysis may be incomplete
Only part of the procurement documentation was analyzed. Additional eligibility requirements, certificates, or submission documents may exist in the remaining tender documentation.
Key Requirements
Technical
- Must be capable of conducting technical testing and analysis of SDA systems.
Administrative
- Electronic submission is required via the specified platform.
- French language only for submission and communication.
Requirements may be incomplete.
Award Criteria
Lot 1
Buyer
Name
Location
ANGERS CEDEX 01, FRA
Website
Identifier
38529030900454
Activity
Environmental protection
Lots (1)
LOT-0001
SDA+ Phase 2 - Experimentation of the Performance Evaluation Protocol for Detection-Stop Systems (SDA) for Onshore Wind Farms
The objective is to organize, implement, and analyze test campaigns of the "factory exit" performance protocol for SDA. The service includes a firm tranche of 32 months and an optional tranche of 17 months. Variants are not allowed.
Duration
Category
Award Criteria
Deadline
Award details
Not specified in notice
refer to procurement documents.
Additional CPV codes
Value note
Show original TED data
Original lot title
Programme SDA+ Phase 2 Expérimentation du protocole d’évaluation de la performance des Systèmes de Détection-Arrêt (SDA) en « sortie d’usine » pour les parcs éoliens terrestres
Original TED description
L'objectif de la prestation est d'organiser, mettre en œuvre et analyser les campagnes de tests du protocole de performance "sortie d'usine" des SDA.
Procurement Details
- Publication date
- 29 Jun 2026
- Languages
- French
Reference metadata
- Legal basis
- 32014L0024
Reference IDs
- Tender ID
- 448775-2026
Documents (1)
Similar tenders
France – Engineering studies – Mission complète de Maîtrise d'oeuvre VRD et ouvrage d'art Zone d'activités d'Ussac-Donzenac
France – Engineering studies – Contrôle pédestre des distances entre la végétation et le réseau aérien nu HTA et contrôle des distances entre les obstacles et le Réseau aérien nu HTA dans le cadre du Contrôle Technique des Ouvrages d’Enedis 2027-2030
France – Engineering services – CONTRÔLE TECHNIQUE DU DISPOSITIF D’AUTOSURVEILLANCE réglementaire DU SYSTÈME DE COLLECTE DU DÉPARTEMENT DU VAL-DE-MARNE
France – Electrical wiring and fitting work – 26TRAV04 - BHN STPM - MARCHE DE TRAVAUX SYSTEMES COURANTS FAIBLES, GTC ET PRIORITE AUX FEUX - PHASE 1 DU TECHNOPÔLE DE LA MER A BIR-HAKEIM ET PHASE 2a SEMR DE SAINTE-MUSSE
Czechia – Engineering design services for the construction of civil engineering works – „RS 1 VRT Praha-Běchovice – Světlá nad Sázavou“; Zpracování dokumentace pro povolení stavby (v režimu BIM)
Romania – Construction work – PT + Execuție “Reabilitare Palat Administrativ Bulevardul Eroilor nr. 5 Brasov”
Opportunity Score
Why this score?
Opportunity
50 / 100
Complexity
60 / 100
Risk factors
The absence of estimated value and award criteria in the notice increases uncertainty in bid preparation and evaluation.
The optional 17-month tranche may or may not be activated, affecting resource planning and pricing.
Deep Portfolio Analysis
Uses:
- Description
- Industries & Services
- Capabilities
- Market & Experience
- Certifications