Project management for Enedis electrical networks construction
Original notice title
France – Engineering studies – Marche de maitrise d'œuvre déléguée pour la construction des réseaux électriques de distribution sous maitrise d’ouvrage Enedis - Direction Régionale Ile de France OUEST
Opportunity Score
Why this score?
Opportunity
60 / 100
Complexity
75 / 100
Risk factors
Procurement documents (technical specifications, contract terms, etc.) were not analyzed. Detailed requirements may aff...
The only award criterion disclosed is 'price is not the only criterion'; no weights or other criteria (e.g., quality, t...
No procurement documents available
Deep Portfolio Analysis
Uses:
- Description
- Industries & Services
- Capabilities
- Market & Experience
- Certifications
Overview
Moderate opportunityKey Facts
- EUR 27.1M estimated value
- Framework procurement
- Services contract
- 3 lots
- Duration until May 2032
- Delegated project management (maîtrise d'œuvre déléguée) for construction and maintenance of electrical distribution networks
- Services related to specific agencies: ACE (electricity columns), ARMA (business connections), AIGP (large projects)
Show full summary
This is a negotiated procedure under the Utilities Directive for delegated project management services related to the construction of electrical distribution networks for Enedis in the Île-de-France Ouest region. The contract is divided into three lots corresponding to different agencies (ACE, ARMA, AIGP) and is structured as framework agreements with a base duration of 48 months, extendable up to 72 months. The total estimated value is EUR 27,100,000. Only the TED XML notice was analyzed; procurement documents were not available.
Risks
Procurement documents (technical specifications, contract terms, etc.) were not analyzed. Detailed requirements may aff...
The only award criterion disclosed is 'price is not the only criterion'; no weights or other criteria (e.g., quality, t...
No procurement documents available
Analysis may be incomplete
Only part of the procurement documentation was analyzed. Additional eligibility requirements, certificates, or submission documents may exist in the remaining tender documentation.
Key Requirements
Technical
- Variant offers are not allowed
- The contract is awarded through a negotiated procedure with prior call for competition
Administrative
- Bidders may submit offers for one, two, or all three lots (maximum 3 lots)
Requirements may be incomplete.
Award Criteria
Lot 1
Lot 2
Lot 3
Buyer
Name
Location
Paris La Défense Cedex, FRA
Website
Buyer profile
Identifier
444 608 442
Activity
Electricity-related activities
Lots (3)
LOT-0001
ACE
Project management services for network construction related to the ACE agency (electricity columns agency). The lot is a framework agreement with an estimated value of EUR 6,346,000 and a framework maximum of EUR 7,932,500. Duration: 48 months firm, renewable twice for 12 months each (total up to 72 months). Includes a conditional tranche.
EUR 27.1M
Estimated value
Location
Duration
Category
Award Criteria
Deadline
Award details
Le prix n’est pas le seul critère d’attribution
Value note
Framework maximum value
Show original TED data
Original lot title
LOT 1 ACE
Original TED description
Ce lot a pout objet des prestations de maitrise d'œuvre de construction de réseaux pour les travaux liés à l'agence ACE (agence colonnes électriques)
LOT-0002
ARMA
Project management services for network construction related to the ARMA agency (business connection agency). Lot is a framework agreement with an estimated value of EUR 13,899,500 and a framework maximum of EUR 17,324,375. Duration: 48 months firm, renewable twice for 12 months each (total up to 72 months). Includes a conditional tranche.
EUR 27.1M
Estimated value
Location
Duration
Category
Award Criteria
Deadline
Award details
Le prix n’est pas le seul critère d’attribution
Value note
Framework maximum value
Show original TED data
Original lot title
LOT 2 ARMA
Original TED description
Ce lot a pout objet des prestations de maitrise d'œuvre de construction de réseaux pour les travaux liés à l'agence ARMA (agence raccordement marché d'affaires)
LOT-0003
AIGP
Project management services for network construction related to the AIGP agency (large projects engineering agency). Lot is a framework agreement with an estimated value of EUR 6,863,800 and a framework maximum of EUR 8,579,750. Duration: 48 months firm, renewable twice for 12 months each (total up to 72 months). Includes a conditional tranche.
EUR 27.1M
Estimated value
Location
Duration
Category
Award Criteria
Deadline
Award details
Le prix n’est pas le seul critère d’attribution
Value note
Framework maximum value
Show original TED data
Original lot title
LOT 3 AIGP
Original TED description
Ce lot a pout objet des prestations de maitrise d'œuvre de construction de réseaux pour les travaux liés à l'agence AIGP (agence ingénierie grands projets)
Procurement Details
- Publication date
- 29 Jun 2026
- Languages
- French
Reference metadata
- Legal basis
- 32014L0025
Reference IDs
- Tender ID
- 445879-2026
Documents (1)
Similar tenders
Switzerland – Electricity – ELE2026 - Fourniture d'électricité pour transN
France – Engineering studies – Mission complète de Maîtrise d'oeuvre VRD et ouvrage d'art Zone d'activités d'Ussac-Donzenac
France – Engineering studies – Contrôle pédestre des distances entre la végétation et le réseau aérien nu HTA et contrôle des distances entre les obstacles et le Réseau aérien nu HTA dans le cadre du Contrôle Technique des Ouvrages d’Enedis 2027-2030
France – Engineering services – CONTRÔLE TECHNIQUE DU DISPOSITIF D’AUTOSURVEILLANCE réglementaire DU SYSTÈME DE COLLECTE DU DÉPARTEMENT DU VAL-DE-MARNE
France – Electrical wiring and fitting work – 26TRAV04 - BHN STPM - MARCHE DE TRAVAUX SYSTEMES COURANTS FAIBLES, GTC ET PRIORITE AUX FEUX - PHASE 1 DU TECHNOPÔLE DE LA MER A BIR-HAKEIM ET PHASE 2a SEMR DE SAINTE-MUSSE
Germany – Electrical installation work – Elektrotechnische Leistungen in 220-/380-kV-Umspannwerken / Electrotechnical Works in 220-/380-kV Substations
Opportunity Score
Why this score?
Opportunity
60 / 100
Complexity
75 / 100
Risk factors
Procurement documents (technical specifications, contract terms, etc.) were not analyzed. Detailed requirements may aff...
The only award criterion disclosed is 'price is not the only criterion'; no weights or other criteria (e.g., quality, t...
No procurement documents available
Deep Portfolio Analysis
Uses:
- Description
- Industries & Services
- Capabilities
- Market & Experience
- Certifications