Tenderwize
Back to tender search

Construction of sewage collector for the construction works of Port Polska with possibility of use during airport operation

Centralny Port Komunikacyjny sp. z o.o.·Warszawa, Poland·Expired · Jul 17, 2026·Open·Works
Structured notice only
Original notice title

Poland – Construction work for water and sewage pipelines – Budowa kolektora ściekowego na czas realizacji robót budowlanych Portu Polska wraz z możliwością wykorzystania na etapie eksploatacji lotniska

45/100

Opportunity Score

Needs reviewHigh complexity
WorksExpired
Why this score?

Opportunity

45 / 100

Complexity

80 / 100

Risk factors

No estimated value or budget provided. Bidders cannot gauge contract magnitude or financial risk.

100% price criterion may lead to a race to the bottom, reducing profitability.

Deep Portfolio Analysis

Deep Company Fit Analysis

Uses:

  • Description
  • Industries & Services
  • Capabilities
  • Market & Experience
  • Certifications

Overview

Moderate opportunity

Key Facts

  • Works contract
  • 1 lot
  • Duration 4347 DAY
  • Preparation of multi-branch detailed designs (Projekty Wykonawcze) based on provided building designs.
  • Preparation of Technical Specifications for Execution and Acceptance of Construction Works (STWiORB).
Show full summary

This tender, issued by Centralny Port Komunikacyjny sp. z o.o., is for the construction of a sewage collector for the Port Polska (Central Communication Port) project in Poland. The scope includes preparation of detailed design, construction, obtaining occupancy permit, and maintenance/operation during the construction period and possibly beyond (via optional tasks). The procedure is open, with electronic submission required. Only one lot is defined, with a 100% price award criterion. The estimated value is not disclosed, and the tender duration is approximately 11.9 years (4347 days). There are inconsistencies in EU funding flags and notice changes, and key procurement documents (e.g., detailed specifications, contract terms) were not analyzed.

Risks

No estimated value or budget provided. Bidders cannot gauge contract magnitude or financial risk.

100% price criterion may lead to a race to the bottom, reducing profitability.

Analysis may be incomplete

Only part of the procurement documentation was analyzed. Additional eligibility requirements, certificates, or submission documents may exist in the remaining tender documentation.

Key Requirements

Technical

  • Bid bond (wadium) of 250,000 PLN required.

Administrative

  • Confidential documents must be accessed by signing a confidentiality agreement before the submission deadline.
  • Electronic submission mandatory via the procurement platform.

Requirements may be incomplete.

Award Criteria

Lot 1

Price – 100% weight100%

Buyer

Location

Warszawa, POL

Buyer profile

Open profile

Identifier

PL 7010894497

Activity

General public services

Lots (1)

LOT-0001

Construction of sewage collector for the construction works of Port Polska with possibility of use during airport operation

Design, construction, and maintenance of a sewage collector and pumping station to serve the CPK airport construction site, with potential continued use during airport operation. Includes preparation of detailed design, supervision, construction, obtaining permit, and operating/maintaining the system.

WorksEU fundedElectronic submission

Location

PL913, Poland

Duration

4347 DAY

Category

Construction work for water

Award Criteria

Price

Deadline

Expired Jul 17, 2026

Procurement Details

Publication date
28 Jun 2026
Languages
Polish

Reference metadata

Legal basis
32014L0025

Reference IDs

Tender ID
443246-2026

Documents (1)