Gas Pipeline Reconstruction Works DN700 and DN400
Original notice title
Poland – Construction work for gas pipelines – Wykonanie robót budowlanych w zakresie przebudowy gazociągów DN700 i DN400 Jarosław-Sędziszów w m. Świlcza
Opportunity Score
Why this score?
Opportunity
40 / 100
Complexity
70 / 100
Risk factors
No estimated contract value is provided, making it difficult to assess project profitability and bid preparation costs.
Only 14 days between notice publication and submission deadline, which may be insufficient for document preparation and...
Deep Portfolio Analysis
Uses:
- Description
- Industries & Services
- Capabilities
- Market & Experience
- Certifications
Overview
Moderate opportunityKey Facts
- Works contract
- 1 lot
- Duration 24 MONTH
- Reconstruction of DN700 and DN400 gas pipelines in Świlcza, Poland
- Works include pipeline construction, reconstruction, or repair of steel gas networks
Show full summary
This tender, issued by Operator Gazociągów Przesyłowych GAZ-SYSTEM S.A., concerns construction works for the reconstruction of DN700 and DN400 gas pipelines in Świlcza, Poland. The procedure is open under the utilities directive. A single lot is envisioned, with a 24-month performance period. Award is based solely on price. The deadline for submission is 2026-07-13 09:00 UTC. No estimated contract value has been disclosed. The tender includes strict financial, experience, and technical eligibility requirements. A bid bond of 1,000,000 PLN is required. Submission is electronic only, in Polish, via the buyer's procurement portal.
Risks
No estimated contract value is provided, making it difficult to assess project profitability and bid preparation costs.
Only 14 days between notice publication and submission deadline, which may be insufficient for document preparation and...
Analysis may be incomplete
Only part of the procurement documentation was analyzed. Additional eligibility requirements, certificates, or submission documents may exist in the remaining tender documentation.
Key Requirements
Technical
- Experience: at least 2 contracts (or one larger) for steel gas pipelines: length ≥ 3 km (or 5.8 km if single), MOP > 1.6 MPa, diameter ≥ DN400, within last 6 years
Eligibility
- Financial: credit line or own funds ≥ 9,000,000 PLN; average annual revenue ≥ 30,000,000 PLN; liquidity ratio ≥ 1.10
Certifications
- Technical: approved welding technology per ISO 15614-1 for L485ME (DN700) and L360NE (DN400) steel grades
Award Criteria
Lot 1
Buyer
Location
Warszawa, POL
Website
Identifier
527-243-20-41
Activity
Production, transport or distribution of gas or heat
Lots (1)
LOT-0001
Gas Pipeline Reconstruction Works DN700 and DN400
Reconstruction of steel gas pipelines DN700 and DN400 in Świlcza, including associated works. Duration 24 months.
Location
Duration
Category
Award Criteria
Deadline
Award details
Cena całkowita brutto oferty - waga 100%
Additional CPV codes
Value note
Show original TED data
Original lot title
Wykonanie robót budowlanych w zakresie przebudowy gazociągów DN700 i DN400 Jarosław-Sędziszów w m. Świlcza
Original TED description
Wykonanie robót budowlanych w zakresie przebudowy gazociągów DN700 i DN400 Jarosław-Sędziszów w m. Świlcza
Procurement Details
- Publication date
- 28 Jun 2026
- Languages
- Polish
Reference metadata
- Legal basis
- 32014L0025
Reference IDs
- Tender ID
- 442183-2026
Documents (1)
Similar tenders
Netherlands – Pipeline, piping, pipes, casing, tubing and related items – EA Kunststof leidingen en hulpstukken 2026
Ireland – Steel – Dynamic Purchasing System (DPS) for Course Consumables for use in Donegal Education and Training Board Training Centres and Schools
Denmark – Construction work – Kvalifikationsordning vedrørende hovedentrepriser for etablering og udvidelse af gasanlæg
Sweden – Heating, ventilation and air-conditioning installation work – DIS - Undercentraler och värmepumpsanläggningar
France – Steel – SYSTÈME DE QUALIFICATION DES TUBES ET ACCESSOIRES METAL GRDF
Ireland – Construction work for gas pipelines – 24/033 - Qualification System for the provision of Engineering, Procurement and Construction Services for South West Scotland Onshore System (SWSOS)
Opportunity Score
Why this score?
Opportunity
40 / 100
Complexity
70 / 100
Risk factors
No estimated contract value is provided, making it difficult to assess project profitability and bid preparation costs.
Only 14 days between notice publication and submission deadline, which may be insufficient for document preparation and...
Deep Portfolio Analysis
Uses:
- Description
- Industries & Services
- Capabilities
- Market & Experience
- Certifications