Maintenance framework for heavy lifting equipment
Original notice title
France – Installation services of lifting equipment – BdD Istres/Miramas et BdD Orange/salon de Provence (13-84) - Accord cadre pour maintien en condition (niveaux 2 à 4) des installations d'appareils de levage lourd (SID-SE 26 065_066 ; 466850)
Opportunity Score
Why this score?
Opportunity
45 / 100
Complexity
60 / 100
Risk factors
Award criteria, eligibility requirements, and required documents are not provided in the structured data or XML notice...
Deadline is 10 July 2026, with only ~15 days from publication (25 June). This is a very tight timeline for preparing a...
Deep Portfolio Analysis
Uses:
- Description
- Industries & Services
- Capabilities
- Market & Experience
- Certifications
Overview
Moderate opportunityKey Facts
- EUR 440k estimated value
- Framework procurement
- Services contract
- 2 lots
- Duration 48 MONTH
- Maintenance (levels 2 to 4) of heavy lifting equipment
- Framework agreement with single-award purchase orders
Show full summary
This tender is a framework agreement for maintenance (levels 2 to 4) of heavy lifting equipment at French air bases (Istres/Miramas and Orange/Salon de Provence). The buyer is SID Sud-Est, a central government defence authority. The tender includes two lots covering different geographic areas. The deadline was amended to 10 July 2026 at 11:00. Documents are available online but were not analyzed in depth.
Risks
Award criteria, eligibility requirements, and required documents are not provided in the structured data or XML notice...
Deadline is 10 July 2026, with only ~15 days from publication (25 June). This is a very tight timeline for preparing a...
Analysis may be incomplete
Only part of the procurement documentation was analyzed. Additional eligibility requirements, certificates, or submission documents may exist in the remaining tender documentation.
Key Requirements
Technical
- Tenderers may bid for both lots (maximum 2 lots can be awarded)
Administrative
- Electronic submission required via Open portal
- Language: French (tender documents in French)
Requirements may be incomplete.
Award Criteria
Lot 1
Buyer
Location
LYON, FRA
Website
Buyer profile
Identifier
13000190200274
Activity
Defence
Lots (2)
LOT-0001
Sites d'Istres, Miramas, Salon de Provence et DGA/Ev
Maintenance (levels 2 to 4) of heavy lifting equipment at sites in Istres, Miramas, Salon de Provence and DGA/Ev. Framework agreement with estimated value €240,000 and maximum value €800,000. Duration 48 months, renewable up to 3 times (12 months each).
EUR 440k
Estimated value
Location
Duration
Category
Award Criteria
Deadline
Award details
Voir règlement de la consultation
Value note
Framework maximum value
Show original TED data
Original TED description
Maintien en condition (niveaux 2 à 4) des installations d'appareils de levage lourd
LOT-0002
Sites d'Orange
Maintenance (levels 2 to 4) of heavy lifting equipment at Orange sites. Framework agreement with estimated value €200,000 and maximum value €600,000. Duration 48 months, renewable up to 3 times (12 months each).
EUR 440k
Estimated value
Location
Duration
Category
Deadline
Award details
Maintien en condition (niveaux 2 à 4) des installations d'appareils de levage lourd
Value note
Framework maximum value
Show original TED data
Original TED description
Maintien en condition (niveaux 2 à 4) des installations d'appareils de levage lourd
Procurement Details
- Publication date
- 25 Jun 2026
- Languages
- French
Reference metadata
- Legal basis
- 32014L0024
Reference IDs
- Tender ID
- 439916-2026
Documents (1)
Similar tenders
Norway – Lifts – Framework agreement for lift service
Spain – Jacks and vehicle hoists – Suministro e instalación de 16 columnas elevadoras ferroviarias 7,5 T en el taller de Naranjos de FGV y 20 columnas elevadoras ferroviarias de 12,5 T en el taller de Machado de FGV. Así como los mantenimientos preventivos y correctivos de estos equipos.
Opportunity Score
Why this score?
Opportunity
45 / 100
Complexity
60 / 100
Risk factors
Award criteria, eligibility requirements, and required documents are not provided in the structured data or XML notice...
Deadline is 10 July 2026, with only ~15 days from publication (25 June). This is a very tight timeline for preparing a...
Deep Portfolio Analysis
Uses:
- Description
- Industries & Services
- Capabilities
- Market & Experience
- Certifications