Construction of a Building of 69 Public Housing Units and 77 Parking Spaces at the Intersection of Vicente Alexandre and San Pedro Poveda Streets, Alicante
Original notice title
Spain – Multi-dwelling buildings construction work – Obras de Edificio de 69 Viviendas de Protección Pública, y 77 Plazas de Aparcamiento, en la confluencia de las calles Vicente Alexandre y San Pedro Poveda, de Alicante.
Opportunity Score
Why this score?
Opportunity
65 / 100
Complexity
45 / 100
Risk factors
The selection criteria are vague; detailed economic and financial requirements are not specified in the notice.
Full procurement documents have not been analyzed; important terms, conditions, and requirements may be missing.
Deep Portfolio Analysis
Uses:
- Description
- Industries & Services
- Capabilities
- Market & Experience
- Certifications
Overview
Moderate opportunityKey Facts
- EUR 11.3M estimated value
- Works contract
- 1 lot
- Duration 24 MONTH
- Construction of a multi-dwelling building with 69 public housing units and 77 parking spaces in Alicante, Spain.
Show full summary
This tender concerns the construction of a building with 69 public housing units and 77 parking spaces in Alicante, Spain. The procedure is an open tender with a single lot, EU-funded, with a 24-month duration. The estimated value is €11,298,571.19. Award criteria are 70% price and 30% quality. Electronic submission is required, and the tender language is Spanish.
Risks
The selection criteria are vague; detailed economic and financial requirements are not specified in the notice.
Full procurement documents have not been analyzed; important terms, conditions, and requirements may be missing.
Analysis may be incomplete
Only part of the procurement documentation was analyzed. Additional eligibility requirements, certificates, or submission documents may exist in the remaining tender documentation.
Key Requirements
Technical
- EU-funded project (Next Generation EU).
- Contract duration: 24 months.
Administrative
- Electronic submission is required.
Requirements may be incomplete.
Award Criteria
Lot 1
Buyer
Location
Valencia, ESP
Buyer profile
Identifier
50951220138882
Activity
Housing and community amenities
Lots (1)
LOT-0000
Construction of a Building of 69 Public Housing Units and 77 Parking Spaces at the Intersection of Vicente Alexandre and San Pedro Poveda Streets, Alicante
Construction works for a building comprising 69 public housing units and 77 parking spaces in Alicante, Spain. Duration: 24 months.
EUR 11.3M
Estimated value
Location
Duration
Category
Award Criteria
Deadline
Award details
Oferta económica.
calidad.
Value note
Show original TED data
Original lot title
Obras de Edificio de 69 Viviendas de Protección Pública, y 77 Plazas de Aparcamiento, en la confluencia de las calles Vicente Alexandre y San Pedro Poveda, de Alicante.
Original TED description
Obras de Edificio de 69 Viviendas de Protección Pública, y 77 Plazas de Aparcamiento, en la confluencia de las calles Vicente Alexandre y San Pedro Poveda, de Alicante.
Procurement Details
- Publication date
- 25 Jun 2026
- Languages
- Spanish
Reference metadata
- Legal basis
- 32014L0024
Reference IDs
- Tender ID
- 439292-2026
Documents (1)
Similar tenders
France – Multi-dwelling buildings construction work – Construction de 16 logements collectifs et 16 parkings en sous-sols sis 11 et 13 rue Conet - 77130 CANNES ECLUSE Marché en corps d'état séparés
Spain – Multi-dwelling buildings construction work – Contratación de las obras de construcción de un edificio de 58 VPP, garajes, trasteros y locales comerciales en la parcela 15 del sector PP-1-R del Bertón, Ayuntamiento de Ferrol (A Coruña).
France – Multi-dwelling buildings construction work – Marché de travaux en corps d'état séparés en vue de la construction de 60 logements collectifs y compris VRD, au 140 Boulevard Gambetta à St-Quentin. (Relance suite à déclaration sans suite de la consultation n°25389.)
Sweden – Sheltered housing construction work – Ramavtal Byggentreprenader
Denmark – Construction work – Udbud af opførelse af almene boliger i Carlsberg Byen i totalentreprise
France – Construction work for multi-dwelling buildings and individual houses – ACCORD-CADRE DE CONCEPTION-REALISATION « MASH HORS SITE NEUF »
Opportunity Score
Why this score?
Opportunity
65 / 100
Complexity
45 / 100
Risk factors
The selection criteria are vague; detailed economic and financial requirements are not specified in the notice.
Full procurement documents have not been analyzed; important terms, conditions, and requirements may be missing.
Deep Portfolio Analysis
Uses:
- Description
- Industries & Services
- Capabilities
- Market & Experience
- Certifications