Supply of cold containers, environmental equipment and related services
Original notice title
France – Special-purpose mobile containers – Fourniture de conteneurs froids, des matériels d'environnement et des prestations associées.
Opportunity Score
Why this score?
Opportunity
60 / 100
Complexity
70 / 100
Risk factors
Low or no orders during the first year; significant investment required for prototype and documentation before any reve...
Strict compliance with NTIM specifications; failure could lead to rejection. Technical dossier (CRT) and memory techniq...
Deep Portfolio Analysis
Uses:
- Description
- Industries & Services
- Capabilities
- Market & Experience
- Certifications
Overview
Moderate opportunityKey Facts
- Framework procurement
- Supplies contract
- 2 lots
- Supply of refrigerated containers (with/without generator, 5m3 or ISO 20-foot, morgue kit) for Lot 1
- Supply of reinforced refrigerated containers for extreme environments for Lot 2
Show full summary
This is a French framework agreement for the supply of cold containers and environmental equipment, with associated services (documentation, spare parts, maintenance, training). The tender is divided into two lots: Lot 1 (refrigerated containers and environmental equipment, max 29M EUR) and Lot 2 (reinforced refrigerated containers for extreme environments, max 1.5M EUR). The framework has a 5-year duration with a prototype phase (approx. 9 months) before order commencement. The buyer is SGAMI EST (with a potential inconsistency in the XML notice mentioning MINARM/SCA/PFC-RBT). The procedure is open, with a submission deadline of 2026-09-14. Award criteria are 50% quality, 40% price, and 10% environmental/social. EU funding is indicated in structured data but contradicted by XML ('no-eu-funds'). Eligibility criteria and required documents are not specified in the provided data. Only the TED XML notice was analyzed; procurement documents were not reviewed.
Risks
Low or no orders during the first year; significant investment required for prototype and documentation before any reve...
Strict compliance with NTIM specifications; failure could lead to rejection. Technical dossier (CRT) and memory techniq...
Analysis may be incomplete
Only part of the procurement documentation was analyzed. Additional eligibility requirements, certificates, or submission documents may exist in the remaining tender documentation.
Key Requirements
Technical
- Framework agreement with 5-year duration (60 months)
- Prototype (tête de série) delivery required within 240 days plus 30-day acceptance
- First year no orders expected; orders may be placed in years 2-5
Requirements may be incomplete.
Award Criteria
Lot 1
Lot 2
Buyer
Location
Cayenne, FRA
Website
Buyer profile
Identifier
11000201100044
Activity
Defence
Lots (2)
LOT-0001
Refrigerated containers and environmental equipment
Supply of refrigerated containers with or without generator, 5m3 or ISO 20-foot, morgue kit, technical documentation, spare parts, maintenance, training, and technical assistance. Framework agreement with no minimum and a maximum of 29,000,000 EUR.
Location
Category
Award Criteria
Deadline
Award details
Le critère Qualité sera apprécié au vu des dossiers techniques (CRT et mémoire technique) en fonction du respect des caractéristiques mentionnées dans les NTIM (Notices Techniques Interarmées Matériel) annexées au CCTP (Cahier des Clauses Techniques Particulières).
Le critère Prix sera apprécié en fonction du montant total hors taxe du panier type.
La note du critère Environnemental et Social (ES) sera appréciée en fonction des réponses apportées au questionnaire de performance environnementale et sociale.
Value note
Show original TED data
Original lot title
Lot 1 : conteneurs frigorifiques et matériels d’environnement
Original TED description
Conteneurs frigorifiques avec ou sans GE de 5m3 ou iso 20 pieds, kit morgue, documentation technique, pièces de rechange, maintenance, formation, assistance technique
LOT-0002
Distribution preparation container
Supply of reinforced refrigerated containers for use in extreme environments, technical documentation, spare parts, maintenance, training, and technical assistance. Framework agreement with no minimum and a maximum of 1,500,000 EUR.
Location
Category
Award Criteria
Deadline
Award details
le critère Qualité sera apprécié au vu des dossiers techniques (CRT et mémoire technique) en fonction du respect des caractéristiques mentionnées dans les NTIM (Notices Techniques Interarmées Matériel) annexées au CCTP (Cahier des Clauses Techniques Particulières).
Le critère Prix sera apprécié en fonction du montant total hors taxe du panier type.
La note du critère Environnemental et Social (ES) sera appréciée en fonction des réponses apportées au questionnaire de performance environnementale et sociale.
Value note
Show original TED data
Original lot title
Lot 2 : conteneur préparation distribution.
Original TED description
conteneurs réfrigérés renforcés pour une utilisation en milieux extrêmes, documentation technique, pièces de rechange, maintenance, formation, assistance technique
Procurement Details
- Publication date
- 24 Jun 2026
- Languages
- French
Reference metadata
- Legal basis
- 32014L0024
Reference IDs
- Tender ID
- 436311-2026
Documents (1)
Similar tenders
Belgium – Modular and portable buildings – MARCHÉ DE LOCATION DE CONTENEURS ET TRAVAUX PRÉPARATOIRES - EXTENSION CUISINE - VÉSALE
France – Special-purpose mobile containers – Location de bungalows fixes et services associés pour les départements de l’Indre, de l’Indre-et-Loire et du Loir-et-Cher
Germany – Field hospital – rescEU - EMT Field Hospitals
France – Second-hand transport vehicles – Système d'acquisition dynamique - Acquisition de divers véhicules, matériels toute motorisation, bennes et remorques d'occasion
Lithuania – Sterilisation, disinfection and hygiene devices – STERILIZAVIMO PRIEMONIŲ UŽSAKYMAI PER CPO LT ELEKTRONINĮ KATALOGĄ
Norway – Pavilion construction work – Dynamic purchasing system for barracks, containers and mobile carriages
Opportunity Score
Why this score?
Opportunity
60 / 100
Complexity
70 / 100
Risk factors
Low or no orders during the first year; significant investment required for prototype and documentation before any reve...
Strict compliance with NTIM specifications; failure could lead to rejection. Technical dossier (CRT) and memory techniq...
Deep Portfolio Analysis
Uses:
- Description
- Industries & Services
- Capabilities
- Market & Experience
- Certifications