Tenderwize
Back to tender search

Supply of 40 Low-Floor Air-Conditioned Articulated Trams

СТОЛИЧЕН ЕЛЕКТРОТРАНСПОРТ ЕАД·гр. София, Bulgaria·EUR 102.3M·Expired · Aug 10, 2026·Open·Supplies
High valueStructured notice only
Original notice title

Bulgaria – Railway and tramway locomotives and rolling stock and associated parts – ДОСТАВКА НА 40 БРОЯ НОВИ НИСКОПОДОВИ КЛИМАТИЗИРАНИ СЪЧЛЕНЕНИ ТРАМВАЙНИ МОТРИСИ ЗА МЕЖДУРЕЛСИЕ 1009 mm

60/100

Opportunity Score

Needs reviewHigh complexity
SuppliesExpired
Why this score?

Opportunity

60 / 100

Complexity

75 / 100

Risk factors

Turnover requirement equal to full estimated value may be overly restrictive and could be challenged.

Extensive technical criteria with subjective scores (e.g., rotating bogies definition, corrosion protection method eval...

Deep Portfolio Analysis

Deep Company Fit Analysis

Uses:

  • Description
  • Industries & Services
  • Capabilities
  • Market & Experience
  • Certifications

Overview

Moderate opportunity

Key Facts

  • EUR 102.3M estimated value
  • Supplies contract
  • 1 lot
  • Duration 36 MONTH
  • Supply of 40 low-floor air-conditioned articulated trams for 1009 mm gauge
  • Training of buyer's staff for operation, maintenance, diagnostics, and repair
Show full summary

The tender by Stolichen Elektrotransport EAD (Sofia) for the supply of 40 new low-floor air-conditioned articulated trams for 1009 mm gauge, including training, diagnostic equipment, special tools, and documentation. Single lot, open procedure, EU-funded (though XML indicates no EU funds? inconsistency noted), estimated value EUR 102,258,376.24. Performance in Sofia, Bulgaria. Deadline 2026-08-10. Award criteria: Price 40%, Technical quality 40%, Delivery time 10%, Warranty conditions 10%. Minimal turnover requirement equals estimated value in rail rolling stock supply.

Risks

Turnover requirement equal to full estimated value may be overly restrictive and could be challenged.

Extensive technical criteria with subjective scores (e.g., rotating bogies definition, corrosion protection method eval...

Analysis may be incomplete

Only part of the procurement documentation was analyzed. Additional eligibility requirements, certificates, or submission documents may exist in the remaining tender documentation.

Key Requirements

Technical

  • Trams must be low-floor, air-conditioned, articulated, for 1009 mm gauge
  • Delivery in 36 months maximum, 12 months minimum
  • Offer must include price, technical specification, delivery time, and warranty conditions

Requirements may be incomplete.

Award Criteria

Lot 1

Price – weight 40 points40%Technical quality – weight 40 points40%Delivery time – weight 10 points10%Warranty conditions – weight 10 points10%

Buyer

Location

гр. София, BGR

Buyer profile

Open profile

Identifier

121683785

Activity

Urban railway, tramway, trolleybus or bus services

Lots (1)

LOT-0001

Supply of 40 Low-Floor Air-Conditioned Articulated Trams

Delivery of 40 new low-floor air-conditioned articulated trams for 1009 mm gauge, training of buyer's personnel for operation and maintenance, supply of diagnostic equipment (Appendix 3), special tools (Appendix 4), and documentation.

SuppliesEU fundedElectronic submission

EUR 102.3M

Estimated value

Location

София, Bulgaria

Duration

Oct 2026

Category

Railway

Award Criteria

Best price-quality ratio

Deadline

Expired Aug 10, 2026

Procurement Details

Publication date
24 Jun 2026
Languages
Bulgarian

Reference metadata

Legal basis
32014L0025

Reference IDs

Tender ID
435717-2026

Documents (1)

Similar tenders