Bridge Replacement Works K147, K268, K276
Original notice title
Germany – Bridge construction work – VE 1: Brücken - K147, K268; K276
Opportunity Score
Why this score?
Opportunity
40 / 100
Complexity
65 / 100
Risk factors
Strict reference requirements may disqualify bidders without recent bridge construction under live traffic on motorways...
Short submission deadline (approx. 30 days) may be insufficient to prepare a compliant bid, especially if documents nee...
Deep Portfolio Analysis
Uses:
- Description
- Industries & Services
- Capabilities
- Market & Experience
- Certifications
Overview
Moderate opportunityKey Facts
- Works contract
- 1 lot
- Duration until Feb 2028
- Demolition of three existing bridge structures on the A1 motorway
- Construction of three new bridge structures
Show full summary
This tender is for the replacement of three bridge structures on the A1 motorway in Germany, including demolition, new construction, earthworks, and road construction on connecting roads. The procedure is open with a single lot (LOT-0000). Award is based solely on price. No estimated value is published. There is an inconsistency regarding EU funding: structured data indicates EU-funded, but the XML notice states no EU funds. Submission deadline is 2026-07-24 09:00 CEST. The tender requires extensive references and certifications.
Risks
Strict reference requirements may disqualify bidders without recent bridge construction under live traffic on motorways...
Short submission deadline (approx. 30 days) may be insufficient to prepare a compliant bid, especially if documents nee...
Analysis may be incomplete
Only part of the procurement documentation was analyzed. Additional eligibility requirements, certificates, or submission documents may exist in the remaining tender documentation.
Key Requirements
Technical
- Provide at least three references for comparable demolition works (PQ category 511_01)
- Provide one reference for construction of a bridge replacement or new build with span >20m under live traffic on a motorway
- Provide one reference for construction of a bridge using precast elements
Requirements may be incomplete.
Award Criteria
Lot 1
Buyer
Location
Stuttgart, DEU
Website
Buyer profile
Identifier
USt-ID DE329214156
Activity
General public services
Lots (1)
LOT-0000
Bridge Replacement Works K147, K268, K276
Replacement of three bridges on the A1 motorway: Wittefelder Allee (K147), Grapperhausen (K276), Düper Straße (K268). Includes demolition, new construction, earthworks, and road construction on connecting roads. Performance locations: Bramsche, Neuenkirchen-Vörden, Dinklage.
Location
Duration
Category
Award Criteria
Deadline
Award details
Preis
Additional CPV codes
Value note
Show original TED data
Original lot title
VE 1: Brücken - K147, K268; K276
Original TED description
VE 1: Brücken - K147, K268; K276
Procurement Details
- Publication date
- 24 Jun 2026
- Languages
- German
Reference metadata
- Legal basis
- 32014L0024
Reference IDs
- Tender ID
- 432867-2026
Documents (2)
Similar tenders
Romania – Road construction works – Servicii de proiectare, asistență tehnica din partea proiectantului şi executie de lucrari la obiectivul de investitii: "Modernizare infrastructura de transport regional pe traseul Cataloi – Frecatei – Posta – Telita – INT. DN22 (DJ229A)”
Germany – Road construction works – Kreuzungsfreier Ausbau Frankenschnellweg, Abschnitt West: Bauleistungen, Straßen- & Ingenieurbau
Germany – Road bridge construction work – A44, Ersatzneubau BW 4412 221 Iserlohner Straße
Italy – Road bridge construction work – S.S. 52 “Carnica” – Lavori di ricostruzione del ponte sul Fiume Fella nei Comuni di Amaro e Venzone dal km. 0+800 circa al km. 1+190 circa.
Germany – Road construction works – Kreuzungsfreier Ausbau Frankenschnellweg, Abschnitt West: Bauleistungen, Straßen- & Ingenieurbau
France – Road bridge construction work – RN12 - Déviation d'Ernée - Construction du viaduc de l'Ernée
Opportunity Score
Why this score?
Opportunity
40 / 100
Complexity
65 / 100
Risk factors
Strict reference requirements may disqualify bidders without recent bridge construction under live traffic on motorways...
Short submission deadline (approx. 30 days) may be insufficient to prepare a compliant bid, especially if documents nee...
Deep Portfolio Analysis
Uses:
- Description
- Industries & Services
- Capabilities
- Market & Experience
- Certifications