Construction of DN400 gas pipeline Mory-Reguły and adaptation for pigging of DN300/DN400 SG Mory-Gassy
Original notice title
Poland – Construction work for gas pipelines – Budowa gazociągu DN400 MOP 8,4 MPa relacji Mory-Reguły i przystosowanie do tłokowania gazociągu DN300/DN400 SG Mory-Gassy
Opportunity Score
Why this score?
Opportunity
40 / 100
Complexity
70 / 100
Risk factors
Strict financial criteria (minimum credit line of 4M PLN, average revenue 12.5M PLN, liquidity ratio ≥1.1) may disquali...
Specific experience requirement for pipeline ≥4km, ≥6.3MPa, ≥DN400, steel L415 may be difficult to meet for less experi...
No procurement documents available
Deep Portfolio Analysis
Uses:
- Description
- Industries & Services
- Capabilities
- Market & Experience
- Certifications
Overview
Moderate opportunityKey Facts
- Works contract
- 1 lot
- Duration until Oct 2028
- Construction of a gas pipeline DN400 with maximum operating pressure (MOP) of 8.4 MPa along the Mory-Reguły route.
- Adaptation of the existing DN300/DN400 gas pipeline SG Mory-Gassy for pigging operations.
Show full summary
Tender by GAZ-SYSTEM S.A. for construction of a high-pressure gas pipeline (DN400, MOP 8.4 MPa) from Mory to Reguły, and adaptation of existing pipeline for pigging. Single lot, open procedure, price-only award. Estimated contract value not disclosed. Strict financial and technical eligibility criteria including minimum 4M PLN credit line, 12.5M PLN average revenue, and specific pipeline construction experience. Bid bond: 250,000 PLN. Deadline: 2026-07-15 10:00 CEST.
Risks
Strict financial criteria (minimum credit line of 4M PLN, average revenue 12.5M PLN, liquidity ratio ≥1.1) may disquali...
Specific experience requirement for pipeline ≥4km, ≥6.3MPa, ≥DN400, steel L415 may be difficult to meet for less experi...
No procurement documents available
Analysis may be incomplete
Only part of the procurement documentation was analyzed. Additional eligibility requirements, certificates, or submission documents may exist in the remaining tender documentation.
Key Requirements
Technical
- Liquidity ratio (current assets / short-term liabilities) ≥ 1.10, or alternatively EBITDA > 0 and net debt/EBITDA ≤ 3.80.
Eligibility
- Financial standing: minimum 4,000,000 PLN credit line or own funds (not summable from different institutions for single bidder, but consortium members can combine).
- Average annual revenue of at least 12,500,000 PLN over last three fiscal years.
Award Criteria
Lot 1
Buyer
Location
Warszawa, POL
Website
Identifier
527-243-20-41
Activity
Production, transport or distribution of gas or heat
Lots (1)
LOT-0001
Construction of DN400 gas pipeline Mory-Reguły and adaptation for pigging of DN300/DN400 SG Mory-Gassy
Construction of a DN400 gas pipeline (MOP 8.4 MPa) and adaptation of existing pipeline for pigging. Requires specific technical expertise in high-pressure gas pipeline construction.
Location
Duration
Category
Award Criteria
Deadline
Award details
Cena całkowita brutto oferty - waga 100%
Value note
Show original TED data
Original lot title
Budowa gazociągu DN400 MOP 8,4 MPa relacji Mory-Reguły i przystosowanie do tłokowania gazociągu DN300/DN400 SG Mory-Gassy.
Original TED description
Budowa gazociągu DN400 MOP 8,4 MPa relacji Mory-Reguły i przystosowanie do tłokowania gazociągu DN300/DN400 SG Mory-Gassy.
Procurement Details
- Publication date
- 24 Jun 2026
- Languages
- Polish
Reference metadata
- Legal basis
- 32014L0025
Reference IDs
- Tender ID
- 432328-2026
Documents (1)
Similar tenders
Opportunity Score
Why this score?
Opportunity
40 / 100
Complexity
70 / 100
Risk factors
Strict financial criteria (minimum credit line of 4M PLN, average revenue 12.5M PLN, liquidity ratio ≥1.1) may disquali...
Specific experience requirement for pipeline ≥4km, ≥6.3MPa, ≥DN400, steel L415 may be difficult to meet for less experi...