Supply of components for the electricity storage system for the MEE ELKO I project at Enea Wytwarzanie in Świerże Górne
Original notice title
Poland – Electricity power lines – „DOSTAWA KOMPONENTÓW SYSTEMU MAGAZYNOWANIA ENERGII ELEKTRYCZNEJ NA POTRZEBY REALIZACJI PROJEKTU BUDOWY MAGAZYNU ENERGII ELEKTRYCZNEJ MEE ELKO I NA TERENIE ENEA WYTWARZANIE SP. Z O.O. W ŚWIERŻACH GÓRNYCH”
Opportunity Score
Why this score?
Opportunity
50 / 100
Complexity
65 / 100
Risk factors
High financial threshold may disqualify many SMEs; 7M PLN bid bond adds upfront cost.
Must demonstrate prior delivery of ≥40 MWh storage system with hot commissioning; limited pool of qualified bidders.
Deep Portfolio Analysis
Uses:
- Description
- Industries & Services
- Capabilities
- Market & Experience
- Certifications
Overview
Moderate opportunityKey Facts
- Supplies contract
- 1 lot
- Duration until Mar 2028
- Supply of components for an electricity storage system
- Includes power converters, uninterruptible power supplies, inverters, power distribution cables, accumulators, batteries, transformers, and transformer substation equipment
Show full summary
Supply of components for an electricity storage system (MEE ELKO I) at Enea Wytwarzanie in Świerże Górne, Poland. Single lot. EU-funded. Open procedure. Award solely on price. Requires high financial capacity and technical experience.
Risks
High financial threshold may disqualify many SMEs; 7M PLN bid bond adds upfront cost.
Must demonstrate prior delivery of ≥40 MWh storage system with hot commissioning; limited pool of qualified bidders.
Analysis may be incomplete
Only part of the procurement documentation was analyzed. Additional eligibility requirements, certificates, or submission documents may exist in the remaining tender documentation.
Key Requirements
Technical
- Single lot for all components
- Open procedure under EU Directive 2014/25/EU (sector procurement)
Administrative
- Electronic submission via Logintrade platform required
Requirements may be incomplete.
Award Criteria
Lot 1
Buyer
Location
Kozienice 1, POL
Buyer profile
Identifier
8120005470
Activity
Electricity-related activities
Lots (1)
LOT-0001
Supply of components for the electricity storage system for the MEE ELKO I project at Enea Wytwarzanie in Świerże Górne
Supply of components for an electricity storage system including power converters, batteries, transformers, and related equipment. Detailed scope defined in Part II of the SWZ.
Location
Duration
Category
Award Criteria
Deadline
Award details
Cena Ofertowa brutto - 100 pkt
Additional CPV codes
Value note
Show original TED data
Original lot title
„DOSTAWA KOMPONENTÓW SYSTEMU MAGAZYNOWANIA ENERGII ELEKTRYCZNEJ NA POTRZEBY REALIZACJI PROJEKTU BUDOWY MAGAZYNU ENERGII ELEKTRYCZNEJ MEE ELKO I NA TERENIE ENEA WYTWARZANIE SP. Z O.O. W ŚWIERŻACH GÓRNYCH”
Original TED description
„DOSTAWA KOMPONENTÓW SYSTEMU MAGAZYNOWANIA ENERGII ELEKTRYCZNEJ NA POTRZEBY REALIZACJI PROJEKTU BUDOWY MAGAZYNU ENERGII ELEKTRYCZNEJ MEE ELKO I NA TERENIE ENEA WYTWARZANIE SP. Z O.O. W ŚWIERŻACH GÓRNYCH” - Szczegółowy opis przedmiotu zamówienia został określony w Części II SWZ.
Procurement Details
- Publication date
- 24 Jun 2026
- Languages
- Polish
Reference metadata
- Legal basis
- 32014L0025
Reference IDs
- Tender ID
- 431873-2026
Documents (1)
Similar tenders
Poland – Construction work – Budowa systemu ładowania autobusów elektrycznych na terenie Oddziału Przewozów R-1 „Woronicza”
France – Transformers – Fourniture et livraison de postes de transformation HTA/BT pour les besoins du SDE 35
Belgium – Power converters – Framework Agreement - Bias Voltage Supplies - new procedure
Denmark – Transformer substation – Hinnerup Fjernvarme - Transformer udbud
Netherlands – Heat pumps – Verduurzaming dorpshuis "Swanla"
Sweden – Electrical machinery, apparatus, equipment and consumables; lighting – Krafttransformator (torrisolerad)
Opportunity Score
Why this score?
Opportunity
50 / 100
Complexity
65 / 100
Risk factors
High financial threshold may disqualify many SMEs; 7M PLN bid bond adds upfront cost.
Must demonstrate prior delivery of ≥40 MWh storage system with hot commissioning; limited pool of qualified bidders.