Supply of BESS System Components

ENEA Nowa Energia sp. z o.o.·Radom, Poland·Expired · Jul 27, 2026·Open·Supplies
Structured notice only
Original notice title

Poland – Uninterruptible power supplies – Przedmiot zamówienia obejmuje dostawę (bez montażu i uruchomienia) komponentów systemu magazynowania energii elektrycznej typu BESS

55/100

Opportunity Score

Needs reviewMedium complexity
SuppliesExpired
Why this score?

Opportunity

55 / 100

Complexity

65 / 100

Risk factors

No estimated value is provided; potential bidders cannot assess the contract's financial scale or budget accordingly.

The right to change locations without limitation within the specified voivodeships could affect logistics and costs.

Deep Portfolio Analysis

Deep Company Fit Analysis

Uses:

  • Description
  • Industries & Services
  • Capabilities
  • Market & Experience
  • Certifications

Overview

Moderate opportunity

Key Facts

  • Supplies contract
  • 1 lot
  • Duration 36 MONTH
  • Supply of BESS components (batteries, inverters, transformers, etc.) without installation
  • Participation in commissioning of the BESS system
Show full summary

This tender, issued by ENEA Nowa Energia sp. z o.o. (lead buyer) jointly with Enea Ciepło sp. z o.o., seeks suppliers for the delivery of Battery Energy Storage System (BESS) components (without installation, but with participation in commissioning). The contract covers a guaranteed minimum of 600 MWh usable capacity within 24 months, with an option for an additional 240 MWh, totaling up to 840 MWh. The contract duration is 36 months. Delivery locations span multiple voivodeships in Poland (Lubuskie, Wielkopolskie, Zachodniopomorskie, Kujawsko-Pomorskie, and Białystok). The procedure is open, conducted in Polish, with an EU funding flag (inconsistency: XML indicates no EU funds). Estimated value is not disclosed. The award is based 85% on price and 15% on quality criteria (cycle life and efficiency). A high bid bond of 4,900,000 PLN is required.

Risks

No estimated value is provided; potential bidders cannot assess the contract's financial scale or budget accordingly.

The right to change locations without limitation within the specified voivodeships could affect logistics and costs.

Analysis may be incomplete

Only part of the procurement documentation was analyzed. Additional eligibility requirements, certificates, or submission documents may exist in the remaining tender documentation.

Key Requirements

Technical

  • Delivery of new, complete, factory-new equipment ready for assembly and commissioning by the buyer or another contractor
  • Contract duration: 36 months from signing
  • Performance in accordance with the delivery schedule (Annex 1d)

Requirements may be incomplete.

Award Criteria

Lot 1

Price: 85% weight85%Cycle life at 65% SoH: 5% weight5%Efficiency: 10% weight10%

Buyer

Location

Radom, POL

Buyer profile

Open profile

Identifier

384813168

Activity

Electricity-related activities

Lots (1)

LOT-0001

Supply of BESS System Components

Delivery of BESS components (batteries, inverters, transformers, etc.) without installation, with mandatory participation in commissioning. The scope includes a guaranteed 600 MWh with an option for an additional 240 MWh. The contract duration is 36 months. Performance locations: multiple counties in Lubuskie, Wielkopolskie, Zachodniopomorskie, Kujawsko-Pomorskie, and Białystok. Two separate contracts will be signed: one with ENEA Nowa Energia and one with Enea Ciepło.

SuppliesEU fundedElectronic submissionSME suitable

Location

Poland

Duration

36 MONTH

Category

Uninterruptible power supplies

Award Criteria

Price

Deadline

Expired Jul 27, 2026

Procurement Details

Publication date
23 Jun 2026
Languages
Polish

Reference metadata

Legal basis
32014L0025

Reference IDs

Tender ID
430805-2026

Documents (1)