Tenderwize
Back to tender search

Design and construction of expressway S12 section from Wieniawa to Radom Południe

Generalna Dyrekcja Dróg Krajowych i Autostrad·Warszawa, Poland·Expired · Jul 17, 2026·Open·Works
Structured notice only
Original notice title

Poland – Construction work – Projekt i budowa drogi ekspresowej S12 odcinek węzeł Wieniawa (bez węzła) - węzeł Radom Południe (z węzłem)

65/100

Opportunity Score

Needs reviewHigh complexity
WorksExpired
Why this score?

Opportunity

65 / 100

Complexity

85 / 100

Risk factors

Only 24 days to prepare a complex design-build proposal; may lead to rushed submission or errors.

Minimum turnover of 167.9 million PLN and credit capacity of 48 million PLN may exclude smaller contractors.

Deep Portfolio Analysis

Deep Company Fit Analysis

Uses:

  • Description
  • Industries & Services
  • Capabilities
  • Market & Experience
  • Certifications

Overview

Moderate opportunity

Key Facts

  • Works contract
  • 1 lot
  • Duration 49 MONTH
  • Design and construction of expressway S12 with dual carriageway, two lanes, and emergency lane
  • Engineering structures: bridges, culverts, retaining walls
Show full summary

Open tender for the design and construction of the S12 expressway section between Wieniawa and Radom Południe in Poland, including engineering structures, environmental protection, and traffic management. Estimated value above 20 million EUR. EU-funded. Deadline: 17 July 2026 at 09:30 UTC.

Risks

Only 24 days to prepare a complex design-build proposal; may lead to rushed submission or errors.

Minimum turnover of 167.9 million PLN and credit capacity of 48 million PLN may exclude smaller contractors.

Analysis may be incomplete

Only part of the procurement documentation was analyzed. Additional eligibility requirements, certificates, or submission documents may exist in the remaining tender documentation.

Key Requirements

Technical

  • Financial capacity/credit line minimum 48 million PLN
  • Experience: at least 1 road project min. 200 million PLN net, dual carriageway, class GP or higher

Eligibility

  • Annual average revenue minimum 167.9 million PLN over last 3 years

Requirements may be incomplete.

Award Criteria

Lot 1

Price (60%)60%Quality - Extended warranty on noise barriers and supporting structures (20%)20%Quality - Extended warranty on bridge structures and equipment (20%)20%

Buyer

Location

Warszawa, POL

Buyer profile

Open profile

Identifier

113-20-97-244

Activity

General public services

Lots (1)

LOT-0001

Design and construction of expressway S12 section from Wieniawa to Radom Południe

Design and build a dual-carriageway expressway with two lanes and emergency lane, including engineering structures, environmental measures, traffic management systems, and integration with existing road network. Duration: 49 months.

WorksEU fundedElectronic submission

Location

PL921, Poland

Duration

49 MONTH

Category

Construction work

Award Criteria

Best price-quality ratio

Deadline

Expired Jul 17, 2026

Procurement Details

Publication date
23 Jun 2026
Languages
Polish

Reference metadata

Legal basis
32014L0024

Reference IDs

Tender ID
430618-2026

Documents (2)

Similar tenders