Supply of multi-element bidirectional struts for mining corridor support
Original notice title
Poland – Mining struts – Dostawy rozpór międzyodrzwiowych wieloelementowych dwustronnego działania do obudowy wyrobisk korytarzowych dla Południowego Koncernu Węglowego S.A.
Opportunity Score
Why this score?
Opportunity
50 / 100
Complexity
30 / 100
Risk factors
The full specifications and contract terms are not included in the analyzed data. Critical details on technical require...
No estimated value; wadium for Lot 1 is significant. Payment term of 60 days may impact cash flow.
Deep Portfolio Analysis
Uses:
- Description
- Industries & Services
- Capabilities
- Market & Experience
- Certifications
Overview
Moderate opportunityKey Facts
- Supplies contract
- 2 lots
- Duration 12 MONTH
- Supply of multi-element double-acting struts for roadway supports (Part 1 - standard struts, Part 2 - adjustable struts).
- Delivery to multiple mining sites: Sobieski (Jaworzno), Janina (Libiąż), Brzeszcze.
Show full summary
This tender concerns the supply of multi-element double-acting mining struts for roadway supports for Południowy Koncern Węglowy S.A., a coal mining company in Poland. The contract is divided into two lots: Part 1 (standard struts) and Part 2 (adjustable struts). The procedure is open, governed by the EU utility directive, with award based solely on price. The estimated contract value is not disclosed. Submission is electronic via a procurement platform, with a deadline of July 17, 2026. Key required documents include the Single European Procurement Document (JEDZ), and declarations regarding group capital and sanctions. A bid bond is required: 79,000 PLN for Lot 1 and 4,000 PLN for Lot 2. The performance period is 12 months, with payment within 60 days of invoicing. An electronic auction may be held if at least two valid bids are received.
Risks
The full specifications and contract terms are not included in the analyzed data. Critical details on technical require...
No estimated value; wadium for Lot 1 is significant. Payment term of 60 days may impact cash flow.
Analysis may be incomplete
Only part of the procurement documentation was analyzed. Additional eligibility requirements, certificates, or submission documents may exist in the remaining tender documentation.
Key Requirements
Technical
- Bid bond (wadium) required: 79,000 PLN for Part 1, 4,000 PLN for Part 2.
- Payment terms: 60 days from receipt of invoice.
Administrative
- Submission via electronic platform only (Open portal).
Requirements may be incomplete.
Award Criteria
Lot 1
Lot 2
Buyer
Location
Jaworzno, POL
Website
Buyer profile
Identifier
6321880539
Activity
Exploration or extraction of coal or other solid fuels
Lots (2)
LOT-0001
Part 1 - Struts for support
Supply of multi-element double-acting struts for roadway support. Detailed specifications are in Annex 5 to the SWZ. Performance locations include Zakład Górniczy Sobieski (Jaworzno), Zakład Górniczy Janina (Libiąż), and Zakład Górniczy Brzeszcze.
Location
Duration
Category
Award Criteria
Deadline
Award details
CENA BRUTTO=100%
Value note
Show original TED data
Original lot title
Część nr 1 zamówienia –Rozpory do obudowy.
Original TED description
Szczegółowy opis Przedmiotu Zamówienia zawarto w Załączniku nr 5 do SWZ
LOT-0002
Part 2 - Adjustable struts for support
Supply of adjustable multi-element double-acting struts for roadway support. Detailed specifications are in Annex 5 to the SWZ. Same performance locations as Lot 1.
Location
Duration
Category
Award Criteria
Deadline
Award details
CENA BRUTTO=100%
Value note
Show original TED data
Original lot title
Część nr 2 zamówienia -Rozpory regulowane do obudowy
Original TED description
Szczegółowy opis Przedmiotu Zamówienia zawarto w Załączniku nr 5 do SWZ
Procurement Details
- Publication date
- 17 Jun 2026
- Languages
- Polish
Reference metadata
- Legal basis
- 32014L0025
Reference IDs
- Tender ID
- 420187-2026
Documents (1)
Opportunity Score
Why this score?
Opportunity
50 / 100
Complexity
30 / 100
Risk factors
The full specifications and contract terms are not included in the analyzed data. Critical details on technical require...
No estimated value; wadium for Lot 1 is significant. Payment term of 60 days may impact cash flow.
Deep Portfolio Analysis
Uses:
- Description
- Industries & Services
- Capabilities
- Market & Experience
- Certifications