Replacement rail services HLK from 2028
Original notice title
Germany – Railway transport services – Ersatzverkehre HLK 2028 ff.
Opportunity Score
Why this score?
Opportunity
50 / 100
Complexity
85 / 100
Risk factors
The procedure may be cancelled if federal funding for either alternative is not confirmed by the time of award.
Only about 2 weeks to prepare and submit a bid, which may be insufficient for complex services.
Deep Portfolio Analysis
Uses:
- Description
- Industries & Services
- Capabilities
- Market & Experience
- Certifications
Tender facts
- Contracting authority
- DB InfraGO AG – Geschäftsbereich Fahrweg (Bukr 16)
- Country
- Germany
- CPV
- 60200000 - Railway transport services
- Deadline
- Jul 03, 2026
- Estimated value
- EUR 250M
Overview
Moderate opportunityKey Facts
- EUR 250M estimated value
- Framework procurement
- Services contract
- 1 lot
- Duration until Dec 2029
- Rail replacement services (Schienenersatzverkehr) during general refurbishment of high-performance corridors (Hochleistungskorridore) in 2028 and possibly 2029.
- Two alternative framework agreements: Option 1: 2028 only (termination 31.12.2028, performance 01.01-31.12.2028). Option 2: 2028-2029 (termination 31.12.2029, performance 01.01.2028-31.12.2029).
Show full summary
This tender by DB InfraGO AG is for rail replacement services (Schienenersatzverkehr) during the general refurbishment of high-performance corridors in Germany in 2028 and possibly 2029. It is a framework agreement with two alternative options (2028 only or 2028-2029) and potential restructuring into three lots. Award is based on price only (100%). Estimated contract value exceeds €250 million. The tender is subject to the Foreign Subsidies Regulation (FSR). Notice published 2026-06-17, deadline 2026-07-03 (very short).
Risks
The procedure may be cancelled if federal funding for either alternative is not confirmed by the time of award.
Only about 2 weeks to prepare and submit a bid, which may be insufficient for complex services.
Analysis may be incomplete
Only part of the procurement documentation was analyzed. Additional eligibility requirements, certificates, or submission documents may exist in the remaining tender documentation.
Key Requirements
Technical
- Tenders not allowed as variants.
Administrative
- Submission of a Foreign Subsidies Regulation (FSR) declaration due to estimated value > €250 million.
- Guarantees as per procurement documents.
Requirements may be incomplete.
Award Criteria
Lot 1
Buyer
Location
Frankfurt Main, DEU
Identifier
fb197f94-7578-4673-8a57-4642ae120532
Activity
Railway services
Lots (1)
LOT-0001
Ersatzverkehre HLK 2028 ff.
Rail replacement services during high-performance corridor refurbishment in 2028 and optionally 2029. Framework agreement, two alternatives, possible restructuring into three lots.
EUR 250M
Estimated value
Location
Duration
Category
Award Criteria
Deadline
Award details
Preis
Value note
Show original TED data
Original TED description
Durchführung von Schienenersatzverkehrsleistungen (SEV) während der Generalsanierung der Hochleistungskorridore 2028 bzw. 2028 und 2029
Procurement Details
- Publication date
- 16 Jun 2026
- Languages
- German
Reference metadata
- Legal basis
- 32014L0025
Reference IDs
- Tender ID
- 416749-2026
Documents (1)
Similar tenders
France – Transport services (excl. Waste transport) – Réalisation des opérations de transports internationaux multimodaux de marchandises pour le compte des unités du CEA/Grenoble, de l’INES et de ses sites rattachés.
Italy – Railway transport services – PROCEDURA APERTA SOPRA SOGLIA COMUNITARIA CON TERMINI RIDOTTI PER URGENZA AI SENSI DELL’ART. 71, COMMI 1 E 3, DEL D.LGS. 31 MARZO 2023, N. 36, GESTITA IN MODALITÀ TELEMATICA AFFIDAMENTO DEL “SERVIZIO DI TRASPORTO FERROVIARIO INTERREGIONALE NEL PERIODO DELLE FESTIVITÀ NATALIZIE 2026, MEDIANTE TRENI DEDICATI – SICILIA EXPRESS NATALE 2026”.
Germany – Railway transport services – Anmietung Transportequipment 2027
Poland – Railway transport services – Usługa transportu kolejowego węgla na potrzeby TAURON Wytwarzanie S.A.
Poland – Railway transport services – Obsługa infrastruktury kolejowej oraz wykonywanie przewozów kolejowych w jej obrębie w Polskiej Grupie Górniczej S.A. Oddział KWK Piast-Ziemowit Ruch Piast.
Poland – Railway transport services – Kompleksowa obsługa infrastruktury kolejowej PGG S.A. Oddział KWK ROW z podziałem na zadania.
Opportunity Score
Why this score?
Opportunity
50 / 100
Complexity
85 / 100
Risk factors
The procedure may be cancelled if federal funding for either alternative is not confirmed by the time of award.
Only about 2 weeks to prepare and submit a bid, which may be insufficient for complex services.
Deep Portfolio Analysis
Uses:
- Description
- Industries & Services
- Capabilities
- Market & Experience
- Certifications