B 103 Temporary bridge over the Müritz-Elde-Waterway in Plau
Original notice title
Germany – Bridge construction work – B 103 Behelfsbrücke üb. die Müritz-Elde-Wasserstraße in Plau
Opportunity Score
Why this score?
Opportunity
45 / 100
Complexity
75 / 100
Risk factors
No estimated value disclosed, which hinders budgeting and bid pricing.
Structured data reports EU-funded, but XML notice indicates no EU funds (FundingProgramCode: no-eu-funds). This may aff...
Deep Portfolio Analysis
Uses:
- Description
- Industries & Services
- Capabilities
- Market & Experience
- Certifications
Overview
Moderate opportunityKey Facts
- Works contract
- 1 lot
- Duration until Apr 2035
- Heavy traffic diversion
- Deep foundations
Show full summary
Open procedure for construction of a temporary bridge (B 103 Behelfsbrücke) over the Müritz-Elde-Waterway in Plau am See, Germany. The scope includes heavy traffic diversion, deep foundations, anchored retaining walls, assembly levels, supports and abutments, transport and assembly of a D-bridge, and modification of traffic light systems. The contract duration is approximately 9 years (planned start 2026-10, end 2035-04). Award is based solely on price. No estimated value is provided. The tender is EU-funded according to structured data, but the XML notice indicates no EU funds (inconsistency). Only one lot. Procurement documents are available via meinauftrag.rib.de but were not analyzed.
Risks
No estimated value disclosed, which hinders budgeting and bid pricing.
Structured data reports EU-funded, but XML notice indicates no EU funds (FundingProgramCode: no-eu-funds). This may aff...
Analysis may be incomplete
Only part of the procurement documentation was analyzed. Additional eligibility requirements, certificates, or submission documents may exist in the remaining tender documentation.
Key Requirements
Technical
- Tenderers must specify which parts will be subcontracted
- Security for contract performance: 5% of contract sum
- Security for defects liability: 3% of final account sum
Requirements may be incomplete.
Award Criteria
Lot 1
Buyer
Location
Schwerin, DEU
Website
Buyer profile
Identifier
13-L51110001000-31
Activity
General public services
Lots (1)
LOT-0000
B 103 Temporary bridge over the Müritz-Elde-Waterway in Plau
Construction of a temporary bridge including heavy traffic diversion, deep foundations, anchored retaining walls, assembly levels, supports and abutments, transport and assembly of a D-bridge, and modification of traffic light systems.
Location
Duration
Category
Award Criteria
Deadline
Award details
Preis
Value note
Show original TED data
Original lot title
B 103 Behelfsbrücke üb. die Müritz-Elde-Wasserstraße in Plau
Original TED description
Umleitung Schwerlastverkehr; Tiefgründung; Herstellung rückverankerte Stützwand, Montageebenen, Stützen und Widerlager; Transport, Montage Einschub D-Brücke; Umbau LSA des WSA
Procurement Details
- Publication date
- 15 Jun 2026
- Languages
- German
Reference metadata
- Legal basis
- 32014L0024
Reference IDs
- Tender ID
- 413397-2026
Documents (2)
Similar tenders
Germany – Bridge construction work – Ersatzneubau der Cäcilienbrücke
Germany – Bridge construction work – B0009 Brücke Königsbrücker Straße Los 1 Ingenieurbau
Netherlands – Construction work for highways, roads – 1-W-0027920-25 Aanleg Verlegde Bosdreef- fase 2
Netherlands – Construction, foundation and surface works for highways, roads – 1-W-0027920-25 Aanleg Verlegde Bosdreef- fase 2
Sweden – Bridge construction work – Bro över Viskasundet i Fredrika #14257#
Germany-Duisburg: Bridge
Opportunity Score
Why this score?
Opportunity
45 / 100
Complexity
75 / 100
Risk factors
No estimated value disclosed, which hinders budgeting and bid pricing.
Structured data reports EU-funded, but XML notice indicates no EU funds (FundingProgramCode: no-eu-funds). This may aff...
Deep Portfolio Analysis
Uses:
- Description
- Industries & Services
- Capabilities
- Market & Experience
- Certifications