Design-build contract for airport infrastructure compliance works
Original notice title
France – Runway resurfacing – Mise en conformité des infrastructures aéroportuaires de l'aéroport de Tarbes Lourdes Pyrénées
Opportunity Score
Why this score?
Opportunity
56 / 100
Complexity
68 / 100
Risk factors
The submission deadline is relatively close to the publication date, leaving limited time to prepare a compliant bid.
Only the XML notice text was extracted; the underlying procurement documents were not analyzed, so technical, contractu...
Deep Portfolio Analysis
Uses:
- Description
- Industries & Services
- Capabilities
- Market & Experience
- Certifications
Overview
Moderate opportunityKey Facts
- Works contract
- 1 lot
- Duration 30 MONTH
- Design-build works for compliance of airport infrastructure at Tarbes Lourdes Pyrénées airport.
- Runway resurfacing.
Show full summary
This is a French works contract for the design-and-build compliance upgrade of Tarbes Lourdes Pyrénées airport infrastructure, focused on runway resurfacing and related airport engineering. The notice indicates electronic submission is required, the procedure is negotiated with call, and the contract duration is 30 months. No contract value is provided in the structured data or XML notice. The extracted XML notice adds optional variants/PSEs and indicates candidate reduction is possible, but the procurement documents themselves were not analyzed beyond the XML notice text.
Risks
The submission deadline is relatively close to the publication date, leaving limited time to prepare a compliant bid.
Only the XML notice text was extracted; the underlying procurement documents were not analyzed, so technical, contractu...
Analysis may be incomplete
Only part of the procurement documentation was analyzed. Additional eligibility requirements, certificates, or submission documents may exist in the remaining tender documentation.
Key Requirements
Technical
- Procedure type is negotiated with call.
- Contract duration is 30 months.
Administrative
- Electronic submission is required.
Buyer
Location
carcassonne, FRA
Buyer profile
Identifier
85282836700015
Activity
Airport-related activities
Lots (1)
LOT-0001
Design-build contract for airport infrastructure compliance works
Design-build works for the compliance upgrade of Tarbes Lourdes Pyrénées airport infrastructure. Scope includes runway resurfacing and airport engineering services. The XML notice also lists optional variants/PSEs: PSE No. 01 unpaved load-bearing and anti-blast shoulders, PSE No. 02 paved shoulders over 7.50 m, PSE No. 03 Taxiway Alpha Code E, and PSE No. 04 reserves for runway centerline.
Location
Duration
Category
Deadline
Award details
Marché de Conception-Réalisation pour la mise en conformité des infrastructures aéroportuaires de l'aéroport de Tarbes Lourdes Pyrénées
Additional CPV codes
Value note
Show original TED data
Original lot title
Marché de Conception-Réalisation pour la mise en conformité des infrastructures aéroportuaires de l'aéroport de Tarbes Lourdes Pyrénées
Original TED description
Marché de Conception-Réalisation pour la mise en conformité des infrastructures aéroportuaires de l'aéroport de Tarbes Lourdes Pyrénées
Procurement Details
- Publication date
- 15 Jun 2026
- Languages
- French
Reference metadata
- Legal basis
- 32014L0024
Reference IDs
- Tender ID
- 410923-2026
Documents (2)
Similar tenders
Opportunity Score
Why this score?
Opportunity
56 / 100
Complexity
68 / 100
Risk factors
The submission deadline is relatively close to the publication date, leaving limited time to prepare a compliant bid.
Only the XML notice text was extracted; the underlying procurement documents were not analyzed, so technical, contractu...
Deep Portfolio Analysis
Uses:
- Description
- Industries & Services
- Capabilities
- Market & Experience
- Certifications