Tenderwize
Back to tender search

Belgium – Construction work – Fietsbrug Koningin Fabiolalaan – realisatie van brug en bijhorende infrastructuurwerken

Stadsontwikkelingsbedrijf GentGent, BelgiumNot disclosed8 days leftopen
30

Opportunity Score

Confidence: 40%

Complexity: medium

8 days

Deadline

works

Contract

Deep Portfolio Analysis

  • Company fit score
  • Missing certificates
  • Eligibility blockers
  • Bid / No-Bid recommendation
Create account for AI analysis

AI Analysis Summary

Moderate opportunity

Open procedure for the construction of a bicycle and pedestrian bridge over the Leie river at Koningin Fabiolalaan in Ghent, including associated infrastructure and landscaping. One lot. Very short submission period (9 days from publication). No estimated value, award criteria, or eligibility criteria disclosed in the notice.

Strengths

Documents available

Open procedure

Medium complexity

Risks

Submission deadline in 8 days

Analysis may be incomplete

Only part of the procurement documentation was analyzed. Additional eligibility requirements, certificates, or submission documents may exist in the remaining tender documentation.

Key Requirements

  • Electronic submission required via e-tendering platform
  • Submission language: Dutch (NLD)
  • Only one lot

Buyer

Name

Stadsontwikkelingsbedrijf Gent

Location

Gent, BEL

Buyer profile

Open profile

Identifier

0367300594_4759

Lots (1)

#LOT-00012026/10 - 1

Construction of a bicycle and pedestrian bridge over the Leie river, including infrastructure works and landscaping. Connections between Rinkkaai and Vissersdijk. Project name: Fietsbrug Fabiolalaan.

45000000BEL

Procurement Details

Publication

14 Jun 2026

Deadline

23 Jun 2026, 10:00

Procedure

open

Contract

works

Language

NLD

Publication #

409992-2026

Classification

Construction work

Performance: Belgium

Documents (2)