Germany – Underground work other than tunnels, shafts and subways – Neue Zeche Westerholt – Baustraße, Rückbau Fundamente Bandbrücke, Leitungsgraben
Opportunity Score
Confidence: 60%
Complexity: high
14 days
Deadline
works
Contract
Deep Portfolio Analysis
- Company fit score
- Missing certificates
- Eligibility blockers
- Bid / No-Bid recommendation
AI Analysis Summary
Open procedure for demolition, earthworks and canal construction works to create a utility corridor of approx. 1,250 m for product and district heating pipelines and power cables in the protection strip of existing elevated lines, with strict completion deadlines and confined space conditions. The tender is issued by Entwicklungsgesellschaft Neue Zeche Westerholt mbH on behalf of RAG AG, with award based on price only.
Strengths
Documents available
Open procedure
14 days left
Risks
Submission deadline in 14 days
Analysis may be incomplete
Only part of the procurement documentation was analyzed. Additional eligibility requirements, certificates, or submission documents may exist in the remaining tender documentation.
Key Requirements
- Submission deadline: 2026-06-29T10:00 UTC (local time 12:00 CEST)
- Electronic submission via subreport platform is required
- Language of submission: German
Award Criteria
Preis
Preis
| Criterion | Type |
|---|---|
Preis Preis | Price |
Buyer
Name
Entwicklungsgesellschaft Neue Zeche Westerholt mbH
Location
Gelsenkirchen, DEU
Website
Identifier
Amtsgericht Gelsenkirchen HRB 16 112
Lots (1)
Demolition of old foundations, terrain modeling, trench construction, dam building with retaining walls, sewer laying, surface dismantling and soil remediation for the utility corridor. Works must be coordinated with utility operators and executed within the protection strip of existing elevated pipelines.
Procurement Details
Publication
14 Jun 2026
Deadline
29 Jun 2026, 10:00
Procedure
open
Contract
works
Duration
8 MONTH
Language
DEU
Publication #
409449-2026
Classification
Performance: Germany
Documents (2)
Opportunity Score
Confidence: 60%
Complexity: high
14 days
Deadline
works
Contract
Deep Portfolio Analysis
- Company fit score
- Missing certificates
- Eligibility blockers
- Bid / No-Bid recommendation