New Rjukan treatment facility, collaboration contract
Original notice title
Norway – Construction work – New Rjukan treatment facility, collaboration contract
Opportunity Score
Why this score?
Opportunity
65 / 100
Complexity
85 / 100
Risk factors
The contracting authority explicitly reserves the right to cancel due to budget or political approval.
Nitrogen removal orders have strict deadlines with potential penalties for non-compliance.
Deep Portfolio Analysis
Uses:
- Description
- Industries & Services
- Capabilities
- Market & Experience
- Certifications
Tender facts
- Contracting authority
- Tinn kommune
- Country
- Norway
- CPV
- 45000000 - Construction work +2 more
- Deadline
- Aug 02, 2026
- Estimated value
- NOK 320M
Overview
Moderate opportunityKey Facts
- NOK 320M estimated value
- Works contract
- 1 lot
- Construction of a new wastewater treatment facility at Bruflot, Rjukan, Norway
- Demolition/clearance of existing Rjukan RA
Show full summary
Tinn municipality seeks a collaboration contract for the design and construction of a new wastewater treatment facility at Bruflot, Rjukan, to replace the existing Rjukan RA. The plant must achieve secondary treatment with a capacity of 17,200 PE, meet stringent phosphorus removal requirements, and comply with nitrogen removal orders (70% by 01.03.2029, 80% by 31.12.2030). The procurement follows a negotiated procedure with prior call for competition. Estimated value: NOK 320,000,000 (excl. VAT). The contracting authority reserves the right to cancel or modify the tender documentation.
Risks
The contracting authority explicitly reserves the right to cancel due to budget or political approval.
Nitrogen removal orders have strict deadlines with potential penalties for non-compliance.
Analysis may be incomplete
Only part of the procurement documentation was analyzed. Additional eligibility requirements, certificates, or submission documents may exist in the remaining tender documentation.
Key Requirements
Technical
- Tenderers must be qualified to participate in a negotiated procedure (request to participate)
- Must meet technical and professional capacity as assessed by the contracting authority
- Apprentice requirements apply (Norwegian Procurement Act §7)
Requirements may be incomplete.
Award Criteria
Lot 1
Buyer
Name
Location
Rjukan, NOR
Identifier
864963552
Activity
General public services
Lots (1)
LOT-0000
New Rjukan treatment facility, collaboration contract
Design and construction of a new sewage treatment facility with secondary treatment, capacity 17,200 PE, including rock halls and above-ground buildings. Work includes demolition of existing plant, upgrading treatment processes, and meeting strict environmental standards. The contract covers all works and associated services.
NOK 320M
Estimated value
Location
Category
Award Criteria
Deadline
Award details
-
Additional CPV codes
Value note
Show original TED data
Original TED description
Tinn municipality is in a process to upgrade the sewage treatment facilities in the municipality. Sewage from the urban areas Mårvik, Attrå and Austbygde have gathered for a new treatment facility established in Mårvik. Rjukan treatment facility shall be cleared and a new treatment facility shall be constructed next to the existing (day facility). Tinn municipality now has a total of three treatment facilities. The treatment facility for Rjukan is the largest and receives sewage water from Rjukan village, as well as holiday homes in the Gaustablikk area. The purified sewage water is emitted to the Hydro tunnel, which is brought down to Tinnsjøen. Rjukan RA is a mechanical/chemical treatment facility based on post-deedimentation. This is a rock plant where the treatment process takes place in rock halls. The external building is a building that houses personnel rooms as well as sludge dewatering and unloading to containers. The average purification effect for total phosphor in 2024 was 83.3%. Only 7 out of 12 samples have been assessed to be within the purification requirement of 90%. We see from the Annual Report for Rjukan RA that the plant is unable to fulfil the cleaning result requirement for phosphors in the event of heavy precipitation and snow melting. The purification result for chemical oxygen consumption (KOF) has been complied with. The existing installations have a capacity of 7700pe. With future tourist development and population growth, new treatment facilities must have a capacity of 17,200pe. This as a backdrop also requires that a new treatment facility must have secondary purification. In addition Statsforvalter has issued an order for 70% nitrogen removal with deadline 01.03.2029 and 80% nitrogen removal by deadline 31.12.2030. The installation will be established at Bruflot, east of the centre of Rjukan. The procurement ́s value is estimated to NOK 320,000,000 excluding VAT. The value is an estimate and is not binding for the contracting authority. See the procurement documents for further information. A draft of the tender documentation is attached to this qualification documentation. The contracting authority reserves the right to make minor, not significant changes to this basis before tenderers are invited to submit a tender. The contracting authority reserves the right to cancel the competition, i.a. in connection with budgetary coverage and political approval. The obligation to make requirements regarding apprentices is considered to apply for this procurement, cf. the Procurement Act § 7. See the attached seriousness terms for further information.
Procurement Details
- Publication date
- 14 Jun 2026
- Languages
- English, Norwegian
Reference metadata
- Legal basis
- 32014L0025
Reference IDs
- Tender ID
- 407561-2026
Documents (2)
Similar tenders
Switzerland – Architectural, construction, engineering and inspection services – Fil Bleu Glatt - Teilprojekt Fil Bleu Nord: Revitalisierung, Verbesserung Hochwasserschutz, Fuss- und Veloweg, Freiraumgestaltung mit Erholungsräumen
Finland – Construction work – 2825001912 / SR-urakka, Uudisrakennus, Helsinki, Lassila, Heka Lassila Hopeatie 14-16 ER Vaihe 1
Norway – Construction work – Dynamic purchasing system for joinery work with the accompanying materials.
France – Industrial machinery – ETUDE, REALISATION ET INSTALLATION D’UN BANC D’ELECTRO-POLISSAGE VERTICAL N° 2 (EPV2) POUR CAVITES ACCELERATRICES – SITE DE SACLAY (91)
Finland – Construction work – SR-urakka, Uudisrakennus, Helsinki, Lassila, Heka Lassila Hopeatie 14-16 ER
Sweden – Construction work – DIS Anläggningsentreprenader
Opportunity Score
Why this score?
Opportunity
65 / 100
Complexity
85 / 100
Risk factors
The contracting authority explicitly reserves the right to cancel due to budget or political approval.
Nitrogen removal orders have strict deadlines with potential penalties for non-compliance.
Deep Portfolio Analysis
Uses:
- Description
- Industries & Services
- Capabilities
- Market & Experience
- Certifications