Poland – Construction, foundation and surface works for highways, roads – Projekt i budowa drogi ekspresowej S19 na odcinku granica woj. podlaskiego – Łosice – granica woj. lubelskiego, odc. realizacyjny nr 2: węzeł „Łosice” (z węzłem) – granica woj. lubelskiego
Opportunity Score
Confidence: 60%
Complexity: high
28 days
Deadline
works
Contract
Deep Portfolio Analysis
- Company fit score
- Missing certificates
- Eligibility blockers
- Bid / No-Bid recommendation
AI Analysis Summary
Design and construction of express road S19 section from Podlaskie voivodeship border to Łosice to Lubelskie voivodeship border (Lot 2). Single lot for design and build of a dual-carriageway express road (class S) with bridges, junctions, environmental protection, and other infrastructure. Estimated value above €20 million. Open procedure with a 47-month duration. Strict eligibility criteria including minimum annual revenue of PLN 160 million and specific experience in similar road and bridge works. Award based on price (60%) and quality (40%) with extended warranty periods as quality criteria.
Strengths
Documents available
Open procedure
28 days left
Analysis may be incomplete
Only part of the procurement documentation was analyzed. Additional eligibility requirements, certificates, or submission documents may exist in the remaining tender documentation.
Key Requirements
- Personal performance of key tasks: main road pavement including production and laying, excluding material supplies and services
- No reliance on third-party resources for key tasks under Art. 118(1) of PPL for demonstrating eligibility
- Submission of single European procurement document (ESPD/JEDZ) with the offer
Buyer
Name
Generalna Dyrekcja Dróg Krajowych i Autostrad
Location
Lublin, POL
Website
Identifier
8971770779
Lots (1)
Design and construction of express road S19, including dual-carriageway, junctions, bridges, environmental protection, and technical infrastructure. Key tasks (main road pavement) must be performed directly by the contractor without subcontracting. Approximately 14.5 km of road.
Procurement Details
Publication
14 Jun 2026
Deadline
13 Jul 2026, 10:00
Procedure
open
Contract
works
Duration
47 MONTH
Language
POL
Publication #
407119-2026
Classification
Performance: Poland
Documents (2)
Opportunity Score
Confidence: 60%
Complexity: high
28 days
Deadline
works
Contract
Deep Portfolio Analysis
- Company fit score
- Missing certificates
- Eligibility blockers
- Bid / No-Bid recommendation