Poland – Heat pumps – Dostawa i montaż pomp ciepła o mocy 2x60 kW w Elektrociepłowni Stary Sącz – MPEC Nowy Sącz
Opportunity Score
Confidence: 50%
Complexity: low
4 days
Deadline
supplies
Contract
Deep Portfolio Analysis
- Company fit score
- Missing certificates
- Eligibility blockers
- Bid / No-Bid recommendation
AI Analysis Summary
This tender by MPEC Nowy Sącz (Poland) seeks the supply and installation of two 60 kW heat pumps at the Stary Sącz heating plant. The procedure is an open tender with a single lot, awarded solely on price (100% weight). The deadline for submission is 19 June 2026. The estimated value is not disclosed. The tender is co-financed by the European Regional Development Fund under the project 'Nowe źródła energii i rozwój sieci ciepłowniczych w Nowym Sączu i Starym Sączu'. The required performance bond and contract details are referenced in the procurement documents. The notice includes a correction extending the bid validity period to 90 days.
Strengths
Documents available
Open procedure
Low complexity
Risks
Submission deadline in 4 days
Analysis may be incomplete
Only part of the procurement documentation was analyzed. Additional eligibility requirements, certificates, or submission documents may exist in the remaining tender documentation.
Key Requirements
- Submission via the e-Zamówienia platform only
- Tender must be submitted in Polish
- Bid validity period: 90 days from the deadline (until 17 September 2026)
Buyer
Name
Miejskie Przedsiębiorstwo Energetyki Cieplnej Spółka z ograniczoną odpowiedzialnością w Nowym Sączu
Location
Nowy Sącz, POL
Identifier
NIP: 734-17-87-660
Lots (1)
Supply and installation of two 60 kW heat pumps at the Stary Sącz heating plant. Detailed scope defined in procurement documents. The lot also covers related works and services (CPV 45251000, 45331000).
Procurement Details
Publication
14 Jun 2026
Deadline
19 Jun 2026, 10:00
Procedure
open
Contract
supplies
Language
POL
Publication #
406675-2026
Classification
Performance: Poland
Documents (2)
Opportunity Score
Confidence: 50%
Complexity: low
4 days
Deadline
supplies
Contract
Deep Portfolio Analysis
- Company fit score
- Missing certificates
- Eligibility blockers
- Bid / No-Bid recommendation