Poland – Construction, foundation and surface works for highways, roads – Projekt i budowa drogi ekspresowej S19 odcinek granica woj. podlaskiego – Łosice – granica woj. lubelskiego, odc. realizacyjny nr 1 granica woj. podlaskiego - węzeł Łosice (bez węzła)
Opportunity Score
Confidence: 65%
Complexity: high
28 days
Deadline
works
Contract
Deep Portfolio Analysis
- Company fit score
- Missing certificates
- Eligibility blockers
- Bid / No-Bid recommendation
AI Analysis Summary
Open tender by Generalna Dyrekcja Dróg Krajowych i Autostrad (GDDKiA) for the design and construction of the S19 expressway section from the Podlaskie voivodeship border to Łosice junction (excluding the junction) in Mazowieckie, Poland. The contract covers approx. 17.263 km of dual-carriageway expressway, including junction, service areas (MOP), engineering structures, environmental facilities, and relocation of technical infrastructure. Estimated value above 20 million EUR. Duration 47 months. Procurement documents available on the platform. Only one lot identified.
Strengths
Documents available
Open procedure
28 days left
Analysis may be incomplete
Only part of the procurement documentation was analyzed. Additional eligibility requirements, certificates, or submission documents may exist in the remaining tender documentation.
Key Requirements
- Contractor must perform key tasks personally (main road pavement construction, including production and embedding, and all pavement layers above native or embankment soil).
- Contractor cannot rely on third-party resources for key tasks (Art. 118 §1 Pzp).
- Bid bond: 7,000,000 PLN.
Buyer
Name
Generalna Dyrekcja Dróg Krajowych i Autostrad
Location
Lublin, POL
Website
Identifier
8971770779
Lots (1)
Design and construction of S19 expressway section from km 0+000 to km 17+263, including dual-carriageway road, one junction, service areas, environmental protection (noise barriers, animal crossings, green areas), engineering structures, and relocation of existing infrastructure. Contractor must personally perform key tasks (main road pavement construction) and cannot rely on third-party resources for these tasks.
Procurement Details
Publication
14 Jun 2026
Deadline
13 Jul 2026, 09:00
Procedure
open
Contract
works
Duration
47 MONTH
Language
POL
Publication #
406342-2026
Classification
Performance: Poland
Documents (2)
Opportunity Score
Confidence: 65%
Complexity: high
28 days
Deadline
works
Contract
Deep Portfolio Analysis
- Company fit score
- Missing certificates
- Eligibility blockers
- Bid / No-Bid recommendation