Poland – Construction, foundation and surface works for highways, roads – Projekt i budowa drogi ekspresowej S19 odcinek granica woj. podlaskiego – Łosice – granica woj. lubelskiego, odc. realizacyjny nr 1 granica woj. podlaskiego - węzeł Łosice (bez węzła)

Generalna Dyrekcja Dróg Krajowych i AutostradLublin, PolandNot disclosed28 days leftopen
60

Opportunity Score

Confidence: 65%

Complexity: high

28 days

Deadline

works

Contract

Deep Portfolio Analysis

  • Company fit score
  • Missing certificates
  • Eligibility blockers
  • Bid / No-Bid recommendation
Create account for AI analysis

AI Analysis Summary

Moderate opportunity

Open tender by Generalna Dyrekcja Dróg Krajowych i Autostrad (GDDKiA) for the design and construction of the S19 expressway section from the Podlaskie voivodeship border to Łosice junction (excluding the junction) in Mazowieckie, Poland. The contract covers approx. 17.263 km of dual-carriageway expressway, including junction, service areas (MOP), engineering structures, environmental facilities, and relocation of technical infrastructure. Estimated value above 20 million EUR. Duration 47 months. Procurement documents available on the platform. Only one lot identified.

Strengths

Documents available

Open procedure

28 days left

Analysis may be incomplete

Only part of the procurement documentation was analyzed. Additional eligibility requirements, certificates, or submission documents may exist in the remaining tender documentation.

Key Requirements

  • Contractor must perform key tasks personally (main road pavement construction, including production and embedding, and all pavement layers above native or embankment soil).
  • Contractor cannot rely on third-party resources for key tasks (Art. 118 §1 Pzp).
  • Bid bond: 7,000,000 PLN.

Buyer

Name

Generalna Dyrekcja Dróg Krajowych i Autostrad

Location

Lublin, POL

Identifier

8971770779

Lots (1)

#LOT-0001Projekt i budowa drogi ekspresowej S19 odcinek granica woj. podlaskiego – Łosice – granica woj. lubelskiego, odc. realizacyjny nr 1 granica woj. podlaskiego - węzeł Łosice (bez węzła)

Design and construction of S19 expressway section from km 0+000 to km 17+263, including dual-carriageway road, one junction, service areas, environmental protection (noise barriers, animal crossings, green areas), engineering structures, and relocation of existing infrastructure. Contractor must personally perform key tasks (main road pavement construction) and cannot rely on third-party resources for these tasks.

45233000, 45233120, 45000000, 45100000, 45110000, 45112000, 45200000, 45221000, 45221120, 45231000, 45310000, 45316000, 45340000, 71320000, 71330000, 71350000, 71510000, 71240000POL

Procurement Details

Publication

14 Jun 2026

Deadline

13 Jul 2026, 09:00

Procedure

open

Contract

works

Duration

47 MONTH

Language

POL

Publication #

406342-2026

Classification

Performance: Poland

Documents (2)