Italy – Road bridge construction work – Affidamento progettazione esecutiva ed esecuzione lavori di ricostruzione del nuovo Ponte sul Torrente Idice in Via Rabuina Comune di Budrio
Opportunity Score
Confidence: 50%
Complexity: medium
26 days
Deadline
works
Contract
Deep Portfolio Analysis
- Company fit score
- Missing certificates
- Eligibility blockers
- Bid / No-Bid recommendation
AI Analysis Summary
Open procedure for the demolition and reconstruction of the Idice bridge in Budrio, Italy, following flood damage in May 2023. The contract includes both design and execution (works), with a single lot valued at €6,647,201.10. Award based on most economically advantageous tender (quality). Submission deadline July 11, 2026.
Strengths
Documents available
Open procedure
Medium complexity
Analysis may be incomplete
Only part of the procurement documentation was analyzed. Additional eligibility requirements, certificates, or submission documents may exist in the remaining tender documentation.
Key Requirements
- Open procedure with electronic submission via SATER platform
- Tenders must be submitted in Italian
- Duration: 506 days (design and construction)
Buyer
Name
UNIONE DI COMUNI TERRE DI PIANURA
Location
Granarolo dell'Emilia, ITA
Buyer profile
Identifier
03014291201
Lots (1)
Design and execution of the new bridge over the Idice stream in Via Rabuina, Budrio. Includes demolition, reconstruction, and related works. CPV main: road bridge construction (45221111), additional: engineering design (71322000).
Procurement Details
Publication
10 Jun 2026
Deadline
11 Jul 2026, 16:00
Procedure
open
Contract
works
Duration
506 DAY
Language
ITA
Publication #
400207-2026
Classification
Performance: Italy
Documents (2)
Opportunity Score
Confidence: 50%
Complexity: medium
26 days
Deadline
works
Contract
Deep Portfolio Analysis
- Company fit score
- Missing certificates
- Eligibility blockers
- Bid / No-Bid recommendation