Germany – Metalworking – 2026-07 DVG "Inventar für die Erneuerung der Gleichrichterunterwerke GRW und DHO mit Kabelzug"
Opportunity Score
Confidence: 40%
Complexity: high
11 days
Deadline
works
Contract
Deep Portfolio Analysis
- Company fit score
- Missing certificates
- Eligibility blockers
- Bid / No-Bid recommendation
AI Analysis Summary
Open tender for the inventory (manufacture, delivery, and installation) of a light rail rectifier substation at the 'Am Grunewald' depot in Duisburg, Germany, as part of the renewal of the Grunewald line substation (UW-GRW). The contract is divided into two construction phases. The tender is conducted by Duisburger Verkehrsgesellschaft AG under the SektVO (sector regulation). The tender deadline is 26 June 2026. The estimated value is not provided in the available data.
Strengths
Documents available
Open procedure
11 days left
Risks
Submission deadline in 11 days
Analysis may be incomplete
Only part of the procurement documentation was analyzed. Additional eligibility requirements, certificates, or submission documents may exist in the remaining tender documentation.
Key Requirements
- Electronic submission via Vergabemarktplatz Metropole Ruhr is required
- Submission language: German
- Variants are not allowed
Buyer
Name
Duisburger Verkehrsgesellschaft AG
Location
Duisburg, DEU
Website
Buyer profile
Identifier
DE 811 271 613
Lots (1)
Manufacture, delivery, and installation of a light rail rectifier substation (inventory) at the 'Am Grunewald' depot in Duisburg, including cable pulling. The existing substation is being relocated to a new building approximately 100m away. The work involves 10kV dry-type transformers, medium-voltage switchgear, 750V DC switchgear for traction power supply, and cable systems. The contract is performed in two construction phases.
Procurement Details
Publication
10 Jun 2026
Deadline
26 Jun 2026, 07:00
Procedure
open
Contract
works
Language
DEU
Publication #
400168-2026
Classification
Performance: Germany
Documents (2)
Opportunity Score
Confidence: 40%
Complexity: high
11 days
Deadline
works
Contract
Deep Portfolio Analysis
- Company fit score
- Missing certificates
- Eligibility blockers
- Bid / No-Bid recommendation