Germany – Medium-voltage equipment – Neubau GUW Wendeschleife - hier: Mittelspannungsschaltanlage und Betongebäude
Opportunity Score
Confidence: 55%
Complexity: medium
9 days
Deadline
supplies
Contract
Deep Portfolio Analysis
- Company fit score
- Missing certificates
- Eligibility blockers
- Bid / No-Bid recommendation
AI Analysis Summary
Open tender by MV Mannheimer Verkehr GmbH for the construction of a prefabricated concrete rectifier substation building (Lot 1) and the supply of a 9-panel 20 kV gas-insulated metal-enclosed MV switchgear (Lot 2) for a new rectifier substation in Mannheim. Both lots are awarded on a 100% price basis. Bidders may submit offers for one or both lots. Submission deadline: 24 June 2026, 10:00 CEST.
Strengths
Documents available
Open procedure
Medium complexity
Risks
Submission deadline in 9 days
Analysis may be incomplete
Only part of the procurement documentation was analyzed. Additional eligibility requirements, certificates, or submission documents may exist in the remaining tender documentation.
Key Requirements
- Bidders must submit commercial register extract not older than 3 months.
- Professional liability insurance of at least EUR 3 million per claim (2x max per year) must be available upon award.
- Declarations on criminal convictions, taxes, social security, insolvency, and compliance with Minimum Wage Act (MiLoG) required.
Award Criteria
Preis
Preis
| Criterion | Type |
|---|---|
Preis Preis | Price |
Buyer
Name
MV Mannheimer Verkehr GmbH
Location
Mannheim, DEU
Identifier
69e24894-b4a4-4e05-b717-22ca60845570
Lots (2)
Herstellung und Lieferung eines Gleichrichterunterwerks als monolithisches Betonfertiggebäude aus Stahlbeton in typgeprüfter Ausführung nach DIN EN 62271-202.
Herstellung und Lieferung einer 9-feldrigen 20-kV-Metall-gekapselte-gasisolierte Mittelspannungsschaltanlage.
Procurement Details
Publication
10 Jun 2026
Deadline
24 Jun 2026, 08:00
Procedure
open
Contract
supplies
Language
DEU
Publication #
399345-2026
Classification
Performance: Germany
Documents (2)
Opportunity Score
Confidence: 55%
Complexity: medium
9 days
Deadline
supplies
Contract
Deep Portfolio Analysis
- Company fit score
- Missing certificates
- Eligibility blockers
- Bid / No-Bid recommendation