Tenderwize
Back to tender search

Czechia – Construction work – „Zkapacitnění výtlačného potrubí pitné vody z ÚV Troubky do VDJ Polkovice, Etapa km 4,702 – VDJ Polkovice"

Vodovody a kanalizace Přerov, a.s.Přerov - Přerov I-Město, Czech RepublicCZK 111,586,192 / ~EUR 4,605,10125 days leftopen
60

Opportunity Score

Confidence: 55%

Complexity: medium

25 days

Deadline

works

Contract

Deep Portfolio Analysis

  • Company fit score
  • Missing certificates
  • Eligibility blockers
  • Bid / No-Bid recommendation
Create account for AI analysis

AI Analysis Summary

Moderate opportunity

This is an open procedure sector works contract for increasing the capacity of a drinking water pipeline from ÚV Troubky to VDJ Polkovice in Czechia. The works include replacement of PVC DN 200 with ductile iron DN 250 using trenchless Berstlining technology (except a short open-cut section), replacement of pumps, and installation of a temporary water supply (dry pipe). The estimated value is CZK 111,586,192 (approx. EUR 4.6 million), with a duration of 420 days. The submission deadline is 10 July 2026. Only the main lot (LOT-0001) is detailed; additional lots appear to be CPV groupings but lack separate titles, descriptions, or deadlines. No selection or award criteria are provided in the structured data or XML notice. Procurement documents are available online but were not extracted for analysis.

Strengths

Documents available

Open procedure

Medium complexity

Analysis may be incomplete

Only part of the procurement documentation was analyzed. Additional eligibility requirements, certificates, or submission documents may exist in the remaining tender documentation.

Key Requirements

  • Tenderers must submit via the electronic system at Open portal
  • Submission language: Czech.
  • Deadline for receipt of tenders: 10 July 2026, 07:00 CET.

Buyer

Name

Vodovody a kanalizace Přerov, a.s.

Location

Přerov - Přerov I-Město, CZE

Buyer profile

Open profile

Identifier

47674521

Lots (1)

#LOT-0001Zkapacitnění výtlačného potrubí pitné vody z ÚV Troubky do VDJ Polkovice, Etapa km 4,702 – VDJ Polkovice

Capacity increase of existing water supply pipeline: replacement of PVC DN 200 with ductile iron DN 250 over 6,293 m using trenchless Berstlining technology (except 70 m open cut), replacement of pumps in two stations, and temporary water supply. Works include crossing watercourses and floodplain areas, requiring emergency and flood plans.

CZK 111,586,19245000000, 45232150, 51100000, 45231112, 45231110, 45231300CZE

Procurement Details

Publication

09 Jun 2026

Deadline

10 Jul 2026, 07:00

Procedure

open

Contract

works

Duration

420 DAY

Language

CES

Publication #

396062-2026

Classification

Performance: Czech Republic

Documents (2)