Germany – Demolition, site preparation and clearance work – Berlin TXL - UTR - BA 1 - Flächenrückbau Rahmenvertrag
Opportunity Score
Confidence: 70%
Complexity: high
21 days
Deadline
works
Contract
Deep Portfolio Analysis
- Company fit score
- Missing certificates
- Eligibility blockers
- Bid / No-Bid recommendation
AI Analysis Summary
Open framework agreement for demolition and site clearance (Flächenrückbau) on the former Berlin Tegel Airport (Urban Tech Republic). Single lot with maximum value of EUR 6,000,000, duration 48 months, open procedure. Strict eligibility and award criteria with price (50%), cost (10%), and quality (40%). Submission deadline 2026-07-06, electronic via meinauftrag.rib.de. German language required.
Strengths
Documents available
Open procedure
21 days left
Analysis may be incomplete
Only part of the procurement documentation was analyzed. Additional eligibility requirements, certificates, or submission documents may exist in the remaining tender documentation.
Key Requirements
- Framework agreement with multiple economic operators (maximum 5)
- Contract duration 48 months
- Electronic submission via meinauftrag.rib.de
Award Criteria
1.1 Angebotspreis (Nettosumme gemäß Leistungsverzeichnis)
1.1 Angebotspreis (Nettosumme gemäß Leistungsverzeichnis)
| Criterion | Type |
|---|---|
1.1 Angebotspreis (Nettosumme gemäß Leistungsverzeichnis) 1.1 Angebotspreis (Nettosumme gemäß Leistungsverzeichnis) | Price |
Buyer
Name
Land Berlin, vertreten durch Berlin TXL Management GmbH
Location
Berlin, DEU
Website
Buyer profile
Identifier
UStIdNr:DE279088119
Lots (1)
Framework agreement with multiple contractors for demolition, removal of sealed surfaces (asphalt, concrete, paving), dismantling of objects (infrastructure, traffic, others), and joint sealing on preserved concrete areas at the former Tegel airport site.
Procurement Details
Publication
08 Jun 2026
Deadline
06 Jul 2026, 10:00
Procedure
open
Contract
works
Duration
48 MONTH
Language
DEU
Publication #
395228-2026
Classification
Performance: Germany
Documents (2)
Opportunity Score
Confidence: 70%
Complexity: high
21 days
Deadline
works
Contract
Deep Portfolio Analysis
- Company fit score
- Missing certificates
- Eligibility blockers
- Bid / No-Bid recommendation