Tenderwize
Back to tender search

Hungary – Construction work – Nyírbátor Várost elkerülő utak kivitelezése

Építési és Közlekedési MinisztériumBudapest, HungaryNot disclosedopen
30

Opportunity Score

Confidence: 35%

Complexity: high

Deadline

works

Contract

SME suitable

Deep Portfolio Analysis

  • Company fit score
  • Missing certificates
  • Eligibility blockers
  • Bid / No-Bid recommendation
Create account for AI analysis

AI Analysis Summary

Moderate opportunity

This is a negotiated procedure with call for competition for the construction of two bypass roads around Nyírbátor, Hungary: a southern-eastern bypass of Highway 471 (Lot 1) and a western bypass of Highway 493 (Lot 2). The project includes road construction, bridge construction, roundabouts, and related works. The estimated value is not disclosed. The deadline for submissions is 24 June 2026 at 11:00 CET. Only Hungarian language is accepted. The financial eligibility requires a minimum revenue of 10 billion HUF from road construction over the last three years. Award criteria are quality (30%) and price (70%). The tender documents are available online but were not analyzed. The short submission period and high financial threshold pose significant risks.

Strengths

Documents available

SME suitable

Electronic submission

Analysis may be incomplete

Only part of the procurement documentation was analyzed. Additional eligibility requirements, certificates, or submission documents may exist in the remaining tender documentation.

Key Requirements

  • Submission must be electronic via EKR system
  • Only Hungarian language accepted for submission
  • Guarantee required (bid bond/guarantee)

Buyer

Name

Építési és Közlekedési Minisztérium

Location

Budapest, HUN

Buyer profile

Open profile

Identifier

15847397241

Lots (2)

#LOT-0001Nyírbátor Déli-keleti elkerülő út megvalósítása

Construction of the 471 main road southern-eastern bypass of Nyírbátor, approximately 7.4 km of 2x1 lane road, including a two-span bridge, 4 new roundabouts, bus bays, and cycle path corrections. Duration 24 months.

45233120, 45221100, 45233125, 45233128, 45233221, 45233228HUN
#LOT-0002Nyírbátor Nyugati elkerülő út megvalósítása

Construction of the 493 main road western bypass of Nyírbátor. Detailed description not provided; scope likely similar to Lot 1. Duration 24 months.

45233120, 45221100, 45233125, 45233128, 45233221, 45233228HUN

Procurement Details

Publication

08 Jun 2026

Deadline

Procedure

open

Contract

works

Duration

24 MONTH

Language

HUN

Publication #

395068-2026

Classification

Performance: Hungary

Documents (2)