Open tender by Staatsbetrieb Sächsisches Immobilien- und Baumanagement (Dresden) for MSR and building automation renovation at TUD Mollier-Bau. Single lot for extension of existing Siemens Desigo PX/CC system. Award solely on price. Duration approx. 2.5 months (Aug–Oct 2026). No estimated value provided in notice. Submission deadline 10 July 2026.
Strengths
Documents available
Open procedure
Low complexity
Analysis may be incomplete
Only part of the procurement documentation was analyzed. Additional eligibility requirements, certificates, or submission documents may exist in the remaining tender documentation.
Key Requirements
- Tender must be submitted electronically via the platform (www.sachsen-vergabe.de) by 10 July 2026 09:00 (local time)
- All correspondence via the platform; questions must be submitted by 1 July 2026 12:00
- Variants not allowed
Award Criteria
Preis
Preis
| Criterion | Type |
|---|---|
Preis Preis | Price |
Buyer
Name
Staatsbetrieb Sächsisches Immobilien- und Baumanagement, Zentrale, Zentralstelle Vergabe- und Vertragsmanagement
Location
Dresden, DEU
Website
Buyer profile
Identifier
233121477
Lots (1)
Installation of a Siemens PX/Desigo CC (BACnet/IP) automation station with 200 DP for HVAC, chilled water, compressed air; additional control panel, field devices, actuators, switchgear cabinet, surge protection, and cabling. System must be Siemens Desigo PX/CC to match existing infrastructure at TU Dresden.
Procurement Details
Publication
08 Jun 2026
Deadline
10 Jul 2026, 07:00
Procedure
open
Contract
works
Language
DEU
Publication #
394456-2026
Classification
Performance: Germany
Documents (2)
Opportunity Score
Confidence: 60%
Complexity: low
25 days
Deadline
works
Contract
Deep Portfolio Analysis
- Company fit score
- Missing certificates
- Eligibility blockers
- Bid / No-Bid recommendation