France – Environmental improvement works – Travaux de gestion écologique 2026/01 Prestation répartie en 5 lots sur des sites différents sur l'amont du territoire du syndicat. Les travaux concernent la restauration des zones humides, la mise en place de dispositifs d'abreuvement et de mise en défens des berges, des travaux sur des plans d'eau, des protections de berges et la création d'un sentier bois sur pilotis en zone humide
Opportunity Score
Confidence: 30%
Complexity: medium
22 days
Deadline
works
Contract
Deep Portfolio Analysis
- Company fit score
- Missing certificates
- Eligibility blockers
- Bid / No-Bid recommendation
AI Analysis Summary
This French tender by Syndicat Mixte du Bassin de l'Isle covers ecological management works across 5 lots: wetland restoration (LOT 1), pond removal (LOT 2), fencing/watering points (LOT 3), bank protection (LOT 4), and boardwalk construction (LOT 5). The open procedure requires electronic submission in French by 7 July 2026. No estimated value, selection criteria, or award criteria are provided in the available data.
Strengths
Documents available
Open procedure
Medium complexity
Analysis may be incomplete
Only part of the procurement documentation was analyzed. Additional eligibility requirements, certificates, or submission documents may exist in the remaining tender documentation.
Key Requirements
- Open procedure; operator can bid for up to 5 lots.
- Electronic submission required via AW Solutions platform.
- All documentation must be in French.
Buyer
Name
Syndicat Mixte du Bassin de l'Isle
Location
Saint Laurent Des Hommes, FRA
Website
Buyer profile
Identifier
30900
Lots (5)
Restoration of wetlands and watercourses.
Draining and removal of pond dykes.
Creation of livestock watering points and stream crossings; installation of livestock fencing.
Procurement Details
Publication
08 Jun 2026
Deadline
07 Jul 2026, 10:00
Procedure
open
Contract
works
Duration
35 DAY
Language
FRA
Publication #
393514-2026
Classification
Performance: France
Documents (2)
Opportunity Score
Confidence: 30%
Complexity: medium
22 days
Deadline
works
Contract
Deep Portfolio Analysis
- Company fit score
- Missing certificates
- Eligibility blockers
- Bid / No-Bid recommendation