Germany – Mainframe computer – HPC-Clusterknoten
Opportunity Score
Confidence: 40%
Complexity: medium
4 days
Deadline
supplies
Contract
Deep Portfolio Analysis
- Company fit score
- Missing certificates
- Eligibility blockers
- Bid / No-Bid recommendation
AI Analysis Summary
This open tender by Universität des Saarlandes seeks supply and installation of HPC cluster nodes in 2 racks with backdoor cooling. Performance location is Darmstadt, Germany. The procedure is open, with electronic submission allowed. Only one lot is clearly defined (LOT-0000). No estimated value is provided. Award criteria: quality (40%) and price (60%). Submission deadline: 2026-06-19 09:00 UTC. Language: German only. Procurement documents are available via the provided URL but were not analyzed. Note: The structured data contains an incomplete second lot entry, but only one lot is substantiated.
Strengths
Documents available
Open procedure
Medium complexity
Risks
Submission deadline in 4 days
Analysis may be incomplete
Only part of the procurement documentation was analyzed. Additional eligibility requirements, certificates, or submission documents may exist in the remaining tender documentation.
Key Requirements
- Provide HPC cluster nodes and accessories
- Install and cable components in 2 racks
- Ensure fail-safe operation and good airflow
Award Criteria
Qualität
Qualität
| Criterion | Type |
|---|---|
Qualität Qualität | Quality |
Buyer
Name
Universität des Saarlandes - Dezernat Zentrale Beschaffung und Dienste
Location
Saarbrücken, DEU
Identifier
Umsatzsteuer-IdNr.: DE138117521
Lots (1)
Supply and installation of HPC cluster nodes and accessories in 2 racks with backdoor cooling, including power and network cabling. Performance in Darmstadt at GSI Helmholtzzentrum. Duration: 112 days.
Procurement Details
Publication
07 Jun 2026
Deadline
19 Jun 2026, 09:00
Procedure
open
Contract
supplies
Duration
112 DAY
Language
DEU
Publication #
389395-2026
Classification
Performance: Germany
Documents (2)
Opportunity Score
Confidence: 40%
Complexity: medium
4 days
Deadline
supplies
Contract
Deep Portfolio Analysis
- Company fit score
- Missing certificates
- Eligibility blockers
- Bid / No-Bid recommendation