Poland – Construction work – Przebudowa i rozbudowa istniejącego budynku biurowo-warsztatowego na halę Stacji Obsługi Tramwajów (budynek A) oraz przebudowa, budowa i rozbiórka układu torowego - sieciowego wraz z budową odwodnienia torów i infrastruktury technicznej w dwóch etapach.
Opportunity Score
Confidence: 55%
Complexity: high
3 days
Deadline
works
Contract
Deep Portfolio Analysis
- Company fit score
- Missing certificates
- Eligibility blockers
- Bid / No-Bid recommendation
AI Analysis Summary
Open tendering procedure (Poland) for reconstruction and extension of an existing office-workshop building into a tram service station hall (building A) and track-network reconstruction with drainage and technical infrastructure in two stages. The project is located in Kraków, at the Podgórze Tram Service Station. The contract is divided into two execution stages: Stage I (rough shell of building A and infrastructure) and Stage II (finishing and equipment, planned start 02.01.2027). A site visit is scheduled for 08.04.2026 (not mandatory). Award criteria: lowest price. Deadline for submission: 18.06.2026 10:00. No estimated value provided in the notice. The tender requires significant experience and financial capacity.
Strengths
Documents available
Open procedure
3 days left
Risks
Submission deadline in 3 days
Analysis may be incomplete
Only part of the procurement documentation was analyzed. Additional eligibility requirements, certificates, or submission documents may exist in the remaining tender documentation.
Key Requirements
- Works must be performed in two stages; Stage II start from 02.01.2027.
- Electronic submission via platform Open portal required.
- Submission language: Polish.
Buyer
Name
MIEJSKIE PRZEDSIĘBIORSTWO KOMUNIKACYJNE SPÓŁKA AKCYJNA W KRAKOWIE
Location
Kraków, POL
Website
Identifier
NIP: 6790085613
Lots (1)
Single lot covering all works: reconstruction and extension of building A into tram service station hall, track-network reconstruction, construction of drainage, technical infrastructure (heating, water, gas, power, ICT), and traction substation. Two stages defined: Stage I (rough shell and infrastructure) until end of 2026; Stage II (finishing, equipment, obtaining permits) from 02.01.2027. Performance in Kraków, Poland. Duration 17 months.
Procurement Details
Publication
04 Jun 2026
Deadline
18 Jun 2026, 10:00
Procedure
open
Contract
works
Duration
17 MONTH
Language
POL
Publication #
388356-2026
Classification
Performance: Poland
Documents (2)
Opportunity Score
Confidence: 55%
Complexity: high
3 days
Deadline
works
Contract
Deep Portfolio Analysis
- Company fit score
- Missing certificates
- Eligibility blockers
- Bid / No-Bid recommendation