France – Demolition work – Bonneville - Réhabilitation de l'ancien site de l'INSPE en collège - Lot n°1 - Décontamination / Curage / Démolition
Opportunity Score
Confidence: 60%
Complexity: medium
23 days
Deadline
works
Contract
Deep Portfolio Analysis
- Company fit score
- Missing certificates
- Eligibility blockers
- Bid / No-Bid recommendation
AI Analysis Summary
This open procedure from the Department of Haute-Savoie (France) concerns the decontamination, clearing, and demolition of the former INSPE site in Bonneville for conversion into a middle school (15 divisions, 450 pupils). The project includes preparatory works, demolition, deconstruction, asbestos removal, and landscaping cleaning. The lot comprises one firm tranche and three optional tranches. The contract is for works with a duration of 8 months. Deadline for tenders: 8 July 2026 at 10:00 (CEST). Estimated value is not provided. Only French language is accepted. A mandatory professional capacity qualification (Qualibat 1552 or equivalent) is required for asbestos treatment.
Strengths
Documents available
Open procedure
Medium complexity
Analysis may be incomplete
Only part of the procurement documentation was analyzed. Additional eligibility requirements, certificates, or submission documents may exist in the remaining tender documentation.
Key Requirements
- Open procedure (no prior qualification required)
- Only French language accepted for submissions
- Electronic submission required via the provided URL
Buyer
Name
Département de la Haute-Savoie
Location
Annecy Cedex, FRA
Website
Buyer profile
Identifier
86303
Lots (1)
Preparatory works, demolition, deconstruction, asbestos removal, and landscaping cleaning for the rehabilitation of the former INSPE site into a middle school. Includes 1 firm tranche and 3 optional tranches.
Procurement Details
Publication
04 Jun 2026
Deadline
08 Jul 2026, 10:00
Procedure
open
Contract
works
Duration
8 MONTH
Language
FRA
Publication #
388308-2026
Classification
Performance: France
Documents (2)
Opportunity Score
Confidence: 60%
Complexity: medium
23 days
Deadline
works
Contract
Deep Portfolio Analysis
- Company fit score
- Missing certificates
- Eligibility blockers
- Bid / No-Bid recommendation