Greece – Substation construction work – Μελέτη, Προμήθεια Εξοπλισμού και Εγκατάσταση («έργο με το κλειδί στο χέρι») ενός Συγκροτήματος αντιστάθμισης αέργου επαγωγικής ισχύος 100 MVAr (Static Var Compensator – SVC) και κατασκευή των υποδομών ΕΠΜ για τη σύνδεση του SVC στον Υ/Σ 150 kV/ΜΤ Άργους ΙΙ
Opportunity Score
Confidence: 60%
Complexity: high
35 days
Deadline
works
Contract
Deep Portfolio Analysis
- Company fit score
- Missing certificates
- Eligibility blockers
- Bid / No-Bid recommendation
AI Analysis Summary
Open tender by ADMIE (Greek Independent Power Transmission Operator) for the design, supply, and installation (turnkey) of a 100 MVAr Static Var Compensator (SVC) and associated substation infrastructure at Argos II 150 kV substation. Single lot, estimated value €11 million, submission deadline 2026-07-20. Strict experience criteria require at least three similar SVC projects in the last 15 years. Electronic submission via Greek platform, documents in Greek only.
Strengths
Documents available
Open procedure
35 days left
Analysis may be incomplete
Only part of the procurement documentation was analyzed. Additional eligibility requirements, certificates, or submission documents may exist in the remaining tender documentation.
Key Requirements
- Eligibility: Experience with at least three (3) SVC projects of ≥100 MVAr inductive range in the last 15 years, connected via a transformer ≥100 MVAr with HV ≥132 kV and MV ≥15 kV.
- At least one SVC must have been in satisfactory operation for at least two years.
- Submission in Greek (ELL) language only.
Buyer
Name
ΑΝΕΞΑΡΤΗΤΟΣ ΔΙΑΧΕΙΡΙΣΤΗΣ ΜΕΤΑΦΟΡΑΣ ΗΛΕΚΤΡΙΚΗΣ ΕΝΕΡΓΕΙΑΣ Α.Ε. (ΑΔΜΗΕ Α.Ε.)
Location
ΑΘΗΝΑ, GRC
Website
Buyer profile
Identifier
1031.F01175.0001
Lots (1)
Turnkey design, supply, and installation of a 100 MVAr inductive SVC and associated transmission infrastructure for connection to Argos II 150 kV/MV substation.
Procurement Details
Publication
04 Jun 2026
Deadline
20 Jul 2026, 11:00
Procedure
open
Contract
works
Language
ELL
Publication #
387510-2026
Classification
Performance: Greece
Documents (2)
Opportunity Score
Confidence: 60%
Complexity: high
35 days
Deadline
works
Contract
Deep Portfolio Analysis
- Company fit score
- Missing certificates
- Eligibility blockers
- Bid / No-Bid recommendation