Poland – Installation of road signs – Zaprojektowanie i budowa modułów rozproszonych stanowiących komponenty Krajowego Systemu Zarządzania Ruchem Drogowym na drodze ekspresowej S17 w podziale na dwie części.

Generalna Dyrekcja Dróg Krajowych i AutostradLublin, PolandNot disclosed7 days leftopen
60

Opportunity Score

Confidence: 65%

Complexity: high

7 days

Deadline

works

Contract

Deep Portfolio Analysis

  • Company fit score
  • Missing certificates
  • Eligibility blockers
  • Bid / No-Bid recommendation
Create account for AI analysis

AI Analysis Summary

Moderate opportunity

This is a Polish public works tender for the design and construction of distributed modules for the National Road Traffic Management System on expressway S17, divided into two lots (Część 2 and Część 3). The procurement continues a previous procedure where parts were cancelled. Lots cover different sections of the S17 expressway. The estimated value is stated as below 20,000,000 EUR. The procedure is open, with electronic submission required in Polish. Strict experience and personnel requirements apply. Only the main two lots are fully defined; additional lot data in structured data appears incomplete. The tender documents are available on the buyer's platform but were not fully analyzed.

Strengths

Documents available

Open procedure

7 days left

Risks

Submission deadline in 7 days

Analysis may be incomplete

Only part of the procurement documentation was analyzed. Additional eligibility requirements, certificates, or submission documents may exist in the remaining tender documentation.

Key Requirements

  • Electronic submission via platform Open portal (free account required)
  • Submission language: Polish
  • Bid validity: 90 days from submission deadline

Buyer

Name

Generalna Dyrekcja Dróg Krajowych i Autostrad

Location

Lublin, POL

Identifier

8971770779

Lots (2)

#LOT-0002Zaprojektowanie i budowa modułów rozproszonych stanowiących komponenty Krajowego Systemu Zarządzania Ruchem Drogowym na drodze ekspresowej S17 w podziale na dwie części.

Design and construction of distributed modules for the traffic management system on S17, section Garwolin to the border of Mazowieckie and Lubelskie voivodeships (km 49+973 to km 75+212). Includes design, construction, integration with existing central system. Duration 21 months.

45233290, 45314300POL
#LOT-0003

Design and construction of distributed modules for the traffic management system on S17, section from the border of Mazowieckie and Lubelskie voivodeships to the 'Sielce' junction (including approaches to the Vistula bridge). Duration 21 months.

45233290, 45231400POL

Procurement Details

Publication

04 Jun 2026

Deadline

22 Jun 2026, 09:00

Procedure

open

Contract

works

Duration

21 MONTH

Language

POL

Publication #

387197-2026

Classification

Performance: Poland

Documents (2)